人教版20xx届九年级上学期期末考试英语试题a卷及答案内容摘要:

B. housework C. school work D. farm work 4. A. happy B. angry C. terrible D. sorry 5. A. ate B. took C. threw D. burnt 6. A. looked at her B. looked her up C. looked for her D. looked her over 7. A. telephone B. bell C. clock D. door 8. A. do C. had left D. came 9. A. help B. see C. wele D. thank 10. A. lost B. was lost C. fot D. was fotten Ⅲ . 阅读理解( 30%) A A young American doctor was sleeping when suddenly his doorbell began to ring. It was already midnight. But what could the doctor do? He had to put on his coat and go downstairs. When he opened the door, he saw a man standing with his hat in his hand. “How do you do, sir?” said the man. “Can you e at once to a place out of town? It’s quite far but you have a car and I can show you the way.” “Certainly,” said the doctor, “I’m quite ready. I can e at once.” In a few minutes the car was standing at the front door, and the man got on the doctor’s car. They drove on for a long time, then the man said, ”Here we are. This is my home. Now I can pay you and you can go back to town.” “But I must see the patient,” the doctor said, “How can I go back without seeing the patient? Where is the patient?” “There is no patient,” explained the man, “Nobody is ill. I live here. You see, one must go home from a town, mustn’t he? There are no taxis at this time of the night, but a doctor often makes night calls, so excuse me. Here is your money. Thank you, doctor. Good night.” 1. When the doorbell began to ring, the doctor_________. A. was sleeping downstairs B. was working downstairs C. was sleeping upstairs D. was working upstairs 2. The man asked the doctor ________. A. to go to his house B. to go downstairs C. to go to bed D. to go to a place out of town left ________. A. at once B. after a few minutes C. on foot D. on a bike the man wanted to do was only _________. A. to fool the doctor B. to give the doctor money C. to get home in the doctor’s car D. to play a joke with the doctor 5. The doctor must be _________ at last. A. happy B. sad C. angry D. ill B Two farmers were on their way home one evening after a hard day39。 s work. Both were tired. They happened to look up at the sky and s。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。