人教新目标版英语八上unit6i’mmoreoutgoingthanmysisiter同步测试一内容摘要:

ouse again. “The rich lady will give me some food to eat. It’s so kind of her.” The man thought. But when he went into the house, Jane opened the back door and said to him, “the grass is taller behind the house.” ( ) 1. What was the weather that day? A. Windy B. Sunny C. Rainy D. Snowy ( ) 2. What was the man eating when the woman saw him? A. Some grass B. Some bread C. Some fruit D. Some chicken ( ) 3. Where did Jane see the man eating? A. At the street B. In front of her house C. Behind her house D. In her house ( ) 4. What did Jane want the man to do? A. To help her cut the grass B. To eat food in her house C. To eat grass in her house D. To eat grass behind her house ( ) 5. Which statement is TRUE? A. Jane was very kind, and she gave the food to the man. B. The man didn’t get any food from Jane. C. The man was rich. He hasn’t had meals for days. (B) The earth moves round the sun, and the moon moves round the earth. When our part of the earth turns to the moon, it is night. The sun is much bigger than the moon. But sometimes the moon looks bigger than the sun, because it’s much nearer to the earth. The sun is very bright. It gives a very strong light. The moon looks quite bright, too. But it doesn’t give any light at all. The moon looks much bigger and brighter than the stars. But actually the stars are much bigger and brighter than the moon. They look smaller than the moon because they’re much farther away from us. 1. ____moves round________. A. The earth。 the moon B. The moon。 the earth C. The moon。 the stars D. The sun。 the earth 2. Sometimes the moon looks bigger than the sun, because_________. A. it is much bigger than the sun B. it es out only at night C. it is much nearer to the earth than the sun D. it doesn’t give a strong light 3. The sun_______________. A. is very bright, and it gives a very strong light B. isn’t bright, but it gives a very st。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。