【新目标】四川省乐山市市中区11-12学年第二学期期末考试初一年级试卷英语内容摘要:
one piece to your sister, but remember to do it like a gentlemen (绅士 ).” “Like a gentleman?” Dick asked. “ How do gentleman do it?” “They always give the bigger piece to the other.” answered his aunt at once. “Oh,” said Dick. He thought about this for a moment. Then he took the cake to his sister and said to her, “Cut this cake in half, Mary.” ( ) 56 Their mother took them to their aunt’s home _______. A. because they all went there for lunch B. and then she stayed with them C. and then she left ( ) 57 Who looked after the children? A. Themselves B. Their aunt C. No one ( ) 58 How many cakes were there for children? A. Two B. Only one C. A cake and a half ( ) 59 A gentleman always thinks about ______ first. A. others B. himself C. nobody ( ) 60 .Dick __________. A. gave a bigger piece to his sister B. did it like a gentleman C. didn’t do it like a gentleman ( C ) A rich man began to learn drawing when he was sixty years old, and he loved it very much. He drew and drew. After twenty years, there were a lot of pictures in his workroom. He thought they were good, and kept them well. One day the old man was ill in bed, but he didn’t fet his pictures. Before he died, he said to Tom, his little grandson, “I want to give my pictures to a school, and then the students will remember me, but which school am I going to give them to, my child?” “Well,” said the little boy, “You’d better give them to a school of blind (盲 的 ) people.” ( ) 61. The old man was Tom’s __________________. A. father B. grandfather C. uncle D. grandmother ( ) 62. The old man loved ___________very much. A. writing B. swimming C. reading D. drawing ( ) 63. The old man maybe die at the age of _____________. A. twenty B. sixty C. eighty D. seventy ( ) 64. Tom thought those pictures were ________________. A. bad B. beautiful C. good D. interesting ( ) 65. The old man wanted to give the pictures to a school because ______________. A. he loved students B. he wanted the students to remember him C. he loved blind (盲的 ) people D. he wanted to get some money ( D ) When you are in England, you must be very careful in the streets because the traffic(交通) drives on the left. Before you cross a street, you must look to the right first and then left. If the traffic lights are red, the traffic must stop. Then the people on foot can cross the road carefully! If the traffic lights are green, the traffic can go. People on foot must stop and wait. In the morning and in the evening when people go to or e from work, the streets are very busy. Traffic is the most dangerous. When you go by bus in England, you must be careful, too. Have a look first, or you will go the wrong way. In many English cities, there are big buses with two floors. You can sit on the second floor. From there you can see the city very well. It’s very interesting. ( ) 66. What is the passage(段落) about? A. The traffic in China. B. The traffic in England. C. The people in England. D. The traffic in America. ( ) 67. When can people on foot cross the road? A. When the traffic lights are green. B. When the traffic lights are red. C. When there are no traffic lights. D. When few people on the road. ( ) 68. When are the streets in England busy? A. In the morning and in the evening. B. In the morning and in the afternoon. C. In the afternoon and in the evening. D. In the morning and at noon. ( ) 69. Why do people like to sit on the second floor? A. Because it’s very high. B. Because it’s very cheap. C. Because you can see the city very well. D. Because they can sleep there. ( ) 70. What’s the difference (不同点 ) between the traffic in England and in China? A. Driving on the left in England and China. B. Driving on the right in England and China. C. Driving on the left in England but on the right in China. D. Driving in the middle of the road in England. 乐山 2020 期期终供题考试 初 一 年级英语试卷 2020 6 第二卷( 共 45 分) 注意事项 : 第Ⅱ卷共 4 页,用钢笔或圆珠笔直接答在试卷上。 1. 答卷前将密封线内的项目填写清楚。 题 号。【新目标】四川省乐山市市中区11-12学年第二学期期末考试初一年级试卷英语
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。