【人教新目标】七年级英语上册unit4where39smyschoolbag?检测题内容摘要:
isn’t in her schoolbag. 5. Her ID card is on the dresser. B My bedroom(卧室) This is my bedroom. It is( 1) old room, but it is very nice. A clock and one picture are ( 2) the wall. My( 3) 录像带 is on the desk. The schoolbag is on the chair. (4)Where’s the baseball? It is under the chair. My friend Jane says(说), “What’s that? Oh, ( 5) .It looks like(看起来像) a hat.” 根据短文内容,完成下列任务。 6. 在画线( 1)处填上一个适当的冠词: 7. 给画线( 2)处选择一个正确的选项: A. in B. under C. on D. to 8. 根据( 3)处所给的汉语意思拼写词语: 9. 根据上下文的意思,将画线( 4)部分译成汉语。 10. 根据上下文的意思给画线( 5)部分选择一个合适的句子: A. it’s a cat on the bed B. it’s a dog in the bed C. it’s a cat in bed D. it’s a dog in bed 五、 根据句意及汉语提示完成单词 (每小题 2 分,满分 10 分) keys are in the (抽屉) 2. (哪里) is the sofa。 (带来) your dictionary here. are her (帽子) . ruler is (在„„的下面) your bed. 六、 根据汉语意思完成句子 (每小题 2 分,满分 10 分)。 are those ? 2.“他的钥匙在沙发上吗。 ”“不,不在。 ” — Are his keys on the sofa? — No, .。 Please the desk the classroom.。 Is your bag the ?。 I can some green . 七、书面表达 (满分 15 分) 李雷想要他妹妹李梅给他带些东西到学校来:地板上的笔记本;书桌上的尺 子;桌底下的录 像带;书橱上的数学书。 请你给他写一张留言条。 词数: 50左右(开头及。【人教新目标】七年级英语上册unit4where39smyschoolbag?检测题
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。