20xx外研版英语九年级下册module4rulesandsuggestionsunit3课后作业a内容摘要:

9。 t 五、阅读理解 (中考 福建) (词数:约 110;建议用时: 5分钟) SAFETY RULES ON THE MTR TRAINS At the station: ◇ Be patient. Line up on the platform (站台) and wait for the train. ◇ Be polite. Let passengers get off first. ◇ Do not rush onto the train. It is dangerous. ◇ When you hear a “beep” sound, do not get on the train. The door is closing. Wait for another train. On the train: ◇ Do not eat or drink on the train. It makes the train dirty. ◇ Do not run on the train. ◇ Give up your seat to old men or women, the disabled or women carrying babies. 26. The text is mainly about how to ________. A. be a careful driver B. buy MTR tickets C. be a good passenger D. keep safe at home 27. People who will get on the train should ________. A. wait in line B. open the door C. ask for help D. leave the seats 28. When you hear a “beep” sound, ________. A. close the door B. rush onto the train C. get off the train at once D. stop and wait for the next train 29. Which picture shows the good behavior on the train according to the text。 A B。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。