20xx-20xx学年牛津版英语八年级下学期期中试题内容摘要:

grew dark, the boy decided to leave. But before he had gone more than a few steps, he turned around, ran back to the old woman and gave her a hug. The woman gave him her biggest smile ever. When the boy opened the door of his house, his mother was surprised by the look of joy(快乐 )on his face and asked what had made him so happy. I had lunch with Love. She has got the most beautiful smile in the world. At the same time, the old woman’s son was also surprised at his mother’s pleasure and asked why. I ate a pizza in the park with Love, she said, and he is much younger than I expected. If the world is full of love, we can enjoy a better life. ( ) 1. When the little boy saw the old woman, she was________. A. looking for a seat in the park B. passing the street C. looking at some birds D. having a pizza ( ) 2. The little boy gave the old woman a Coke because ________. A. the old woman still felt hungry B. he wanted to see the smile again C. he didn,t like the drink D. the old woman paid him for it ( ) 3. The old woman gave the little boy the biggest smile________. A. after the little boy went home B. before it grew dark C. when she was drinking Coke D. after the little boy hugged her ( ) boy’s mother was surprised to see her son was very_____when the door opened. A. pleased B. sad C. unhappy D. angry ( ) 5. Which of the following is TRUE? A. The little boy failed to find Love. B. Both the little boy and the old woman found what they wanted at last. C. The little boy decided never to go home. D. The old woman gave the little boy a hug to thank him. B A friend of mine named Paul received an expensive car from his brother as a Christmas present. On Christmas Eve when Paul came out of his office, a street urchin(顽童 ) was walking around the shining car.“Is this your car , Paul?”he asked. Paul answered, “Yes , my brother gave it to me for Christmas.”The boy was surprised(惊奇 ).“You mean your brother gave it to you and it did not cost you anything? Boy, I wish„”He hesitated( 犹豫 ). Of course, Paul knew what he was going to wish for(希望 ).He was going to wish he had a brother like that. But what the boy said surprised Paul greatly. “I wish,”the boy went on , “that I could be a brother like that.”Paul looked at the boy in surprise, then he said again, “Would you like to take a ride in my car?” “Oh yes , I’d love that.” After a short ride, the boy turned and with his eyes shining, said, “Paul ,would you mind (介意 )driving in front of my house?” Paul smiled a little. He thought he knew what the boy wanted. He wanted to show his neighbours that he could ride home in a big car. But Paul was wrong again. “Will you stop where those two steps are? the boy asked. He ran up to the steps. Then in a short while Paul heard him ing back, but he was not ing fast. He was carrying his little crippled(残疾的 ) brother. He sat him down on the step and pointed to the car. “There she is, Buddy, just like I told you upstairs. His brother gave it to him for Christmas and it didn’t cost him a cent( 美分 ). And some day I’m going to give you one just like it„then you can see for yourself all the nice things in the Christmas windows that I’ve b een trying to tell you about.” Paul got out and lifted the boy to the front seat of his car. The shiningeyed older brother climbed in beside him and the three of them began an unfettable(难忘的 ) holiday ride. ( ) street urchin was very surprised when ________. A. Paul received an expensive car B. Paul told him about the car C. he saw the shin。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。