20xx-20xx学年度第一学期一起六年级英语期中试卷及答案外研社英语内容摘要:

und the world.” The Butterfly started to fly around to find the flower to be his bride. First, he found a snowdrop. “ What a pretty flower she is! But she39。 s too small.” The Butterfly flew to another place. He found a saffron this time. “ Oh, she is beautiful. But she39。 s too mature.” The Butterfly flew around again. “ Wow, she39。 s amazing!” He found an anemone. “ But she39。 s too passionate.” The Butterfly flew away. Then he met a violet. “ She is a very soft flower, but she is too tender to be my bride.” Then he went to a tulip. “ Hi, butterfly!” A red tulip nodded her head and greeted the butterfly. “ Oh, hi!” Even though he replied to the red tulip, the Butterfly thought that the red tulip is too dazzling to be his bride. “ What do I have to do now? I can39。 t find my bride.” This time, he met a daffodil. “ That daffodil is too pure. She is too pure and she even looks lonely.” The Butterfly did not like the daffodil as his bride. The Butterfly arrived at the place filled with apple tree flowers. “ Tomorrow, the apple tree flower will fade along with the wind even if she is blooming today.” The apple tree flower wasn39。 t good enough to be the butterfly39。 s bride, either. There was a pea flower. “ Wow, she is very splendid!” Pea flowers were in elegant bloom with red and white colors. The Butterfly liked the pea flower because she was neither too lonely nor too dazzling. xK b1. Com “ Hi, Miss Pea flower?” Butterfly flew closer to her to ask to be his bride. Then, he caught sight of a messy flower hanging on a leaf with a withered bean chaff. He ran away in a hurry after seeing that. In this way, spring and summer passed. But the butterfly still could not find his bride. Autumn came. One day Butterfly smelled a strong scent while he was flying. There was a peppermint in the。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。