无线传感器网络论文:无线传感器网络分簇路由协议最小跳数ns内容摘要:
which is different from the traditional wireless works, and classifying the routing protocols which have been proposed for wireless sensor works. Detailed analysis of several typical working mechanism of routing protocols has been carried out and their advantages and disadvantage have also been summarized, based on which an excellent minimum hopping based routing protocol will be , describing the design background of LHBCRP and introducing the MTE and LHR algorithms. Based on the idea of clustering, we introduce the bined MTE and LHR algorithms into WSN intercluster routing Construction. We proposed a new LeastHopBased Clustering Routing Protocol(LHBCRP). LHBCRP improves threshold function considering the residual energy of nodes. By setting the number o。无线传感器网络论文:无线传感器网络分簇路由协议最小跳数ns
相关推荐
检查配线的组序一定要符合设计要求。 五、预防质量通病之措施 本工程按优质工程进行管理与控制,其优质工程的目标体系与创 优质工程的保证措施在本工程施工组织设计中做了详述。 本措施不再述。 13 创优质工程除对各分部、分项、工序工程施工中,精心操作,一丝不苟、高标准严要求作业外,关键是防止质量通病。 为此,提出防止通病的作业措施如下: 砖墙砌体组砌方法: ⑴ 、组砌方法:一顺一丁组砌
、节点移动等因素会造成报文丢失和冲突,将会严重影响 TCP 的性能,所以要对传输层进行改造,以满足数据传输的需要。 5)节能 问题 Ad Hoc 终端一般采用电池供电。 为了电池的使用寿命,在网络协议的设计中,要考虑尽量节约电池能量。 6)网络管理 Ad Hoc 的自组织网方式对网络管理提出了新的要求,不仅要对网络设备和用户进行管理,还要有相应的机制解决移动性管理、服务管理
,休闲信道会 : • 转移到一个新的空闲信道上 • 通知所有空闲的对讲机转移到空闲信道上 • 原有的空闲信道转换为通话信道 • 开始在这个通话信道上中继语音通信 摩托数字对讲多信道智能系统 xxXXXX 有限公司 9 当通话中止时,这个通话信道会 : • 该中继台会通知对讲机新的休闲信道或相关的信道 • 对讲机会转移到中继台通知的信道上 xxPlus 系统的动态分配信道的优点 •
, 学术界提出了众多 WSN 专用 MAC 协议,部分协议己经在实验环境甚至实际系统中得到应用和验证。 我们对这些协议进行研究,选取了部分较为重要的和近期提出的 MAC 协议,对其核心机制、特点和优缺点等进行了分析和比较。 3 常 用 的 MAC层协议 针对无线传感器网络的特性,已经提出了很多种 MAC 层协议,在这一部分,我们将对 它们进行一些概要性的介绍,列举它们在各种可能的条件下的各种行为
样线和楼层水准标高,用钢尺复核轴线的准确性,在确认其无误后才可柱模支撑。 柱模封闭前应核查钢筋绑扎是否符合要求,有无铁丝垫块及布设是否合理,并将柱底清凿冲洗干净后才能封模固定,安装结束后应对其轴线、垂直度、几何尺寸进行仔细认真的复核、验收。 柱高超过 2m以上时应开设门子板、门子板与模板同时组装临时拆开,待 混凝土浇到该处时再封闭。