工程造价毕业论文建设标准和成本外文参考文献内容摘要:
ng/ventilation/airconditioning) system, wider column spacing, lower floor stiffness (less stringent vibration criterion), lower 10 10 山东建筑大学毕业设计外文文献及译文 floorloading,fewer firecontrol features and other code requirements, steelframed or steel/concrete hybrid structural system with concrete flatslab flooring system, smaller footings, and(typically) curtain wall fenestration. This approach usually enables offices to have operable windows. This twobuilding approach can be seen clearly at Gillespie Neurosciences Building, the Sprague Building, Hewitt Hall, and the UCI Medical Center Health Sciences Laboratory,where consolidating and separating nonlaboratory functions saved 710 percent in overall construction costs and 15 percent/year in energy expense. (The nonlaboratory building incurs a small fraction of the energy expense of the laboratory block.) A set of design strategies, applied in bination, has proven effective in controlling the cost of laboratories: ? Utilizing a consistent lab module ? Utilizing a reasonable vibration criterion and locating ultrasensitive conditions atgrade or employing benchtop vibration isolation ? Using 22 ft. X 22 ft. columnspacing ? Concentrating fume hoods and utility risers into a central ―wet zone,‖ thus limiting horizontal mechanical distribution ? Concentrating laboratory support areas into the central core of a laboratory structure, where utilities are available but daylight is not needed, thus enabling lab structures to be 110132 feet wide ? Utilizing dualusage circulation/equipment crosscorridors through this central lab support zone, with sufficient width (typically 11 feet) to line the corridors with shared equipment while providing crosscirculation through the lab support zone ? Utilizing open laboratory layout with one or more ―ghost‖ corridors for intra lab circulation ? And, most importantly, concentrating nonlaboratory functions into an adjoining, lowercost structure (as discussed in detail above). To further control laboratory construction costs, nonstandard fume hood sizes are minimized, ―generic‖ lab casework is specified, laboratorygrade movable tables 11 11 山东建筑大学毕业设计外文文献及译文 substitute for fixed casework in some lab bays, building DI systems provide intermediate water quality (with localized water purity polishing in the lab, rather than buildingwide),facilitywide piped services do not include gases that can be costeffectively provided locally via canisters, and glasswash facilities are consolidated typically, one glass wash facility for an entire laboratory building. Finally, our design philosophy leans toward generic, modular laboratories supported by a robust building infrastructure, rather than highly customized spaces with limited capacity to make later changes. This is an important trade off. Although some postoccupancy expenses may be necessary to ―finetune‖ a laboratory to a PI?s requirements, building infrastructure elements – typically over sized twenty percent, including HVAC supply ducts, exhaust system c。工程造价毕业论文建设标准和成本外文参考文献
相关推荐
我也深刻认识了我自身专业知识的重要性。 期间有一位学姐,刚刚大学毕业走上工作岗位,由于一个错误被骂的很惨,连我在一边听着都胆战心惊。 这位学姐刚刚工作,就被公司安排了计算一个工程的工程量,结果她用的图拿错了,整个计算书全部不对。 当发现问题的时候已经晚了,只能延迟了招投标,并且连夜通宵加班重新做了一份新的。 这个失误让合作双方都损失惨重,学姐自己更是被骂被处分,多 方没有一方获利
折叠编辑本段分类构成 从现有的文案分类有很多种,按照 4A 标准,一般有四类 :助理文案 (ACW), 文案 (CW 策划文案 策划文案 ),高级文案 (ACW),资深文案 (SCW),其中稍微要区别的是高级文案与资深文案,前者要求的是文案的撰写能力,而后者不仅仅是文案的撰写能力还包括做文案的年资。 有些 4A 公司设有文案主任 (CE)一 职,大体上与文案职责类似,有时候负责专项。
利率 ic恰好等于内部收益率 IRR时,此时的动态投资回收期就等于项目(或方案)计算期,即 Pt’ =n。 一般情况下,若 Pt’ < n,则必然有 IRR> ic和 NPV> 0。 因此,动态投资回收期法与 IRR法和 NPV法在方案评价方面是等价的。 三、经济效果评价方法 (一)评价方案类型 评价方案类型包括独立型方案、互斥型方案、互补型方案、现金流量相关型方案、组合 —
2、赖氨酸含量的高低。 加工品质除包括容重、硬度、出粉率、面粉白度等一次加工品质外,还应看面筋含量、面团稳定时间、沉降值等二次加工品质。 不同用途的优质小麦对各项指标都有不同要求,并非蛋白质含量越高越好,且不说用作饼干、糕点的弱筋小麦其蛋白质含量必须低于某一数值(因这种小麦加工出的糕点才能色、香、味俱佳),就是用作面包的强筋小麦,也不能只看蛋白质含量一个指标。 有些品种蛋白质含量虽然很高