机械外文翻译文献翻译数控加工工艺内容摘要:
coordinate values set by the memory, reset back to zero run is no longer working, will need to rerun the tool and reset to XαZβ location G50. If it is production, processing, after the End of a return to the starting point for continued processing under the G50 is, in the process some errors on the work piece coordinate system may be modified. In view of the first sentence of the above procedures using G50 work piece coordinate system set up many defects, I will want to approach the work piece coordinate system fixed on the machine will process the first sentence changed to G50 XαZβ after G00 Xα Zβ, problem solved. The course of its operation only to find G50 using the abovementioned fivestep process before, that is, 1,2,3,4,5 steps to achieve, it will run the tool to a safe location, out of process, and can run automatically. Even if power outages and other unforeseen circumstances occur, restart the system, in the Edit mode to move the cursor without affecting the safe processing of the work piece processing process program segment, according to automate the processing can continue. First sentence of the above procedure to replace G50 with G00 is the substance of the work piece coordinate system fixed on the machine, no longer limited to the origin G50 Xα Zβ process constraints, without changing the work piece coordinate system, easy operation, reliability, and received an unexpected effect. Chinese metal processing online Second, control of dimensional accuracy skills 1. To amend the value of a knife up to ensure dimensional accuracy First on the knife because of error or other causes beyond the work piece work piece error tolerance, can not meet the processing requirements, can be added by modifying the knife so that the work piece size to meet the requirement to ensure that the radial dimensions are as follows: a. absolute coordinate input method According to the big decrease, a small increase principle, a knife up at 001 ~ 004 modified. Such as cut off on the 2nd slot at a big size work piece , and 002 showed up knives are , may enter the , to reduce the knife on the 2nd meeting. b. the relative coordinate method as in the previous case, enter 002 knife fill , also the same result. Similarly, the axial size of the control also and so on. Such as cylindrical with a knife on the 1st axis somewhere above processing, size, long , can be pleted at 001 knife enter . 2. Semifinishing to ensure that the impact of the elimination of screw gap dimensional accuracy For the majority of CNC lathe using a longer time, because of the effects of screw space and processing of the work piece dimensions are often unstable situation. At this time, we can rough after finishing a halfspace to 机械专业中英文文献翻译 eliminate the effects of screw. 1, such as a knife with G71 cylindrical rough, you can fill in the 001 knife enter , call the G70 a fine car, parking measurements, and then fill in the 001 knife enter , once again calling a G70 Finish . Finish a half after this time, eliminating the effects of screw clearance to ensure the stability of the dimensional accuracy. 3. To ensure dimensional accuracy Programmer a. to ensure dimensional accuracy absolute programming there is an absolute and relative programming. Programming refers to the relative curve in the processing, the location of the end of the line segment to the starting point for the coordinates of the segment and to determine the origin of the coordinate system. In other words, programming is relatively often at the origin of the coordinates transform, continuous displacement is bound to result in a cumulative error, the absolute programming are in the processing of the whole process, have a relatively unified reference point, that is, coordinates of the origin, so the accumulated error over the relative Programming small. CNC turning work piece, the work piece precision radial dimension than the axial size of the general high precision, it is in the preparation of procedures, the use of the radial size of the absolute best programming, taking into account the processing and the convenience of programming, often used sizes of axial relative programming, but the essential axial size, the use of the absolute best programming. b. to ensure dimensional accuracy numerical conversion A lot of cases, the pattern on the size of the baseline and benchmark the size of the required programming inconsistent and should be first on the base pattern size coordinates converted to programming in size. Figure 2b, in addition to size of , the rest is marked directly by Figure 2a and size to be converted by the program size. One of, , φ16mm and the three dimensions of respectively limit the size of two average size after the programming. 4. Modify the program and control the size of premium knives CNC Machining, we often encounter such a situation: the procedure to run automatically after stopping measurement and found that fail work piece size, size irregular Change. Such as a knife with 1 cylindrical work piece processing as shown in Figure 3, the postroughing and semifinishing parking measurements, the size of the radial axis paragraph as follows: , and . In this connection, I used a knife to amend the procedures and methods make up the remedy, as follows: a. modify the program X30 original program unchanged, X23 changed , X16 changed , As a result, are in excess of the shaft above the name of tolerance uniform size。 b. knife to fill Knife on the 1st at 001 imported premium . After these procedures and a twopronged knife revised up, and then call the refined procedures, the general size of the work piece can be effectively guaranteed. CNC Turning CNC program is based on automated processing, the actual processing, and the operator only has a strong ability to use the program instructions and a wealth of practical skills i。机械外文翻译文献翻译数控加工工艺
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
香菇绿霉菌的综合防治技术
1、霉是在香菇生产过程中最易发生、危害极大的竞争性杂菌。 如管理方法不当、防治不及时、会给香菇生产造成重大损失、甚至绝产绝收。 因此了解绿霉菌发病症状条件、掌握绿霉菌的综合防治技术对于香菇养植户来讲是十分必要的。 现简介如下。 一、绿霉发病症状条件绿霉发病初期、菌丝呈白色斑块逐渐变绿、后期为深绿色、墨绿色直至松软腐烂。 绿霉发病适合温度 2032、偏酸环境、高温高湿利于绿霉菌的发生蔓延。 二
桩基工程施工合同(适用于钻孔灌注桩)[最新
质量标准、或确立双方业务往来的流 程和标准、或在本合同中有特殊规定的、或完成本合同所必须的)及现场管理规定都视为本合同的组成部分,对承包人均具有约束力,承包人不能以任何理由提出异议(程序本身有错误的情况除外)或其他要求。 如程序本身有错误,承包人应在收到这些程序后的七天内提出书面意见,否则视为承包人已接受。 桩基工程施工合同 (适用于钻孔灌注桩 ) 有限公司 施工合同 合同编号: 签约日期: 年
某村生态养殖场沼气工程设计方案
割泵 沼液贮池 农用 沼渣沉淀池 水封罐 阻火器 锅炉 发电或户用燃烧 冲圈污水 潜污泵 沼液 调配池 集污池 潜污泵 格栅渠 【 XX 市 XX 区 XX 村 XX 生态养殖场 沼气工程设计方案 】 13 把液体加入到厌氧发酵罐内经过厌氧发 酵产生沼气进入 气柜 在经过脱硫脱水输出供沼气发电机 或户用燃烧 使用。 【 XX 市 XX 区 XX 村 XX 生态养殖场 沼气工程设计方案 】 14