机械仪表]仪表工程师专业英语汇总内容摘要:
同步误差 Synchro error 比例度 Proportional band 等速法 Uniform velocity method 阶跃法 Step change method 执行器 Actuator 气动薄膜调节阀 Pneumatic diaphragm control valve 流量特性 :直线 Flow characteristic: Liner 对数 Logarithmic 信号压力 Signal pressure 公称力矩 Nominal moment 带手轮散热片阀门定位器 With hand wheel , radiator amp。 valve 气闭 Air to close 气开 Air to open 快开式 Quickopen type 高压气动薄膜执行机构 High pressure pneumatic diaphragm actuating mechanism 气动活塞切断阀 Pneumatic piston cutoff valve 带手轮散热片 With hand wheel , radiator 气动长行程执行机构 Pneumatic longstroke actuating mechanism 其他 Other 隔离器 Sealing pot 调压器 Pressure regulator 框架式仪表盘 Frame type instrument panelboard with sides bend back 半 模拟 仪表盘 Semigraphic instrument (panelboard) 空白半模拟仪表盘 Blank semigraphic instrument panelboard 左侧门 Left side door 右侧门 Right side door 直形橱式操纵台 Console with wardrobe 仪表箱 Instrument box 保温箱 Heat insulated box 仪表保护箱 Instrument protecting box 铭牌框 Nameplate 光字排 Illuminated nameplate 右开门左封闭柜式仪表盘 Case type instrument panelboard with door at right side amp。 left side enclosed 仪表检验设备 Calibrating devices for instruments 低 电位直流电位差计 Lowpotential . potentiometer 直流复射式检流计 . reflecting galvanometer 便携式饱和标准电池 Portable sturated standard cell 高温管式电阻炉 High temperature electric resistance tubular furnace 单双臂两用直流 Singlearm amp。 doublearm (doublepurpose) . bridge 携带 式直流单臂电桥 Portable singlearm . bridge 携带式直流电位差计 Portable . ptentiometer 晶体管稳压电源 Transistorized voltage stabilizer 恒流可调信号源 Constant current adjustable signal source 超级恒温水浴 Supergrade thermostat with water bath 超级恒温油浴 Supergrade thermostat with oil bath 万用表 Avometer 标准电热偶 Standard thermocouple 标准铂电阻温度计 Standard platinum resistantance thermometer 兆欧表 Megameter 直流毫安表 . milliammeter 晶体管 参数 测试仪 Transistor parameter tester 标准水银温度计 Standard mercury thermometer 台式手绕线机 Bench type hand winding machine 十进位电阻箱 Decad type resistance box 旋转式直流电阻箱 Rotary . resistance box 微调电阻箱 Fine turning resistance box 直流标准电阻 . standard resistance 晶体管毫伏表 Transistorized millivoltmeter 电子 交流 稳压器 Electronic . voltage stabilizer 超低频信号发生器 Ultra low frequency signal generator 真空表校验表 Calibrator for vacuum gauges 标准压力表 Calibrator for pressure gauges 秒表 Stop watch 电热干燥器强制空气循环 Electric drying oven , forceair circulation 氮气钢瓶 Nitrogen cylinder 手电钻 Hand electric drill 冷藏瓶 Vacuum flask 电吹风 Electric blower 手摇试压泵 Wobble pump for pressure testing 旋片式真空泵 Ratary vane type vacuum pump 标准准真空表 Standard vacuum gauge 氧气 压力表 Oxygen pressure gauge 步话机 Walkietalkie 氧气压力表校验仪 Calibrator for oxygen pressure gauge 气动仪表校验台 Testing stand for pneumatic instruments 示波器 Oscillograph 自耦变压器 Autotransformer 阀门 Valves 卡套式球阀 Globe valve with sealing bushing 仪表截止阀 Instrument block valve 接表式仪表截止阀 Direct adapting instrument block valve 节流式仪表截止阀 Throttling type instrument block valve 内螺纹截止阀 Internal threaded block valve 气源球阀 Ball valve for air supply 二通阀 Twoway valve 切换阀 Switchover valve 直形外螺纹截止阀 Straight external threaded block valve 角形外螺纹截止阀 Angle external threaded block valve 压套式仪表截止阀 Instrument block valve with pressed coupling 气动蝶阀 Pneumatic butterfly valve 热动式疏水器 Thermooperated steam trap 图名 Titles of drawings 仪表盘正面布置图 Instrument panelboard layout 仪表盘盘后布置图 Arrangement on the back of instrument panelboard 仪表盘盘后接线图 Wiring diagram on the back of instrument panelboard 仪表盘盘后接管图 Piping diagram on the back of instrument panelboard 仪表盘盘内接线图 Instrument panelboard inside wiring diagram 电缆 ,管缆平面敷设图 Plan for running cable amp。 cabled tubings 由 —至 —管线平面敷设图 Plan of instrument piping amp。 conduit running from – to – 电缆电线外部连接 系统 图 Scheme of external cable amp。 wire connections 气动管线外部连接系统图 Scheme of external pneumatic piping connections 供电原理图 Scheme of power supply 仪表供气空视图 Ismetric view of instrument air supply 半模拟盘上信号灯原理接线图 Wiring scheme of signal lamps mounted on the semigraphic panelboard 仪表保温伴热图 Instrument tracing amp。 instrument flow diagram 压力引线夹套保温示意图 Heat insulation diagram for jacked pressure impulse pipe 压力 , 流量引线保温伴热示意图 Heat insulation diagram for pressure amp。 flow impulse pipes with tracing lines 运转 设备信号原理图 Signalization scheme for equipment running 电气设备材料 Electrical apparatus amp。 materials 端子箱 Terminal box 普通型接线端子 Ordinary terminal 开关接线端子 Terminal with switch 熔断器接线端子 Terminal with fuse 标记型接线端子 Marking terminal 可调电阻接线端子 Terminal with adjustable resistance 电气带盖三通 Threeway conduit fitting with cover 电气带盖二通 Twoway conduit fitting with cover 14 线插头座 14wire socket 14针插头 14pin plug 14孔插座 14hole socket 电流开关 Current switch 装置式自动开关 Cluster automatic switch 油浸式多点切换开关 Oilimmersed multipoint switch 油浸琴键开关 Oilimmersed key switch 气动电开关 Air operated electrical switch 换步开关 Step transfer switch 小型通用继电器 Small ordinary relay 单相插座 Singlephase socket 螺旋式熔断器 Screwplug 单相母线 Singlephase bus 闪光信号报警器 (附电铃及按钮 ) Flashing annunciator (with alarm and pushbutton) 无火花冲击式电铃 Nonspark impulse type alarm bell 镍铬 考铜补偿导线 Chromelcopel extension wire 聚氯乙烯绝缘屏蔽软线 PVC insulated shielded soft wire 铜芯橡皮绝缘聚氯乙烯护套电力电缆 PVC sheathed rubberinsulated copper wire power cable 铜芯聚氯乙烯绝缘线 PVC insulated copper wire 铜芯聚氯乙烯绝缘软线 PVC insulated copper soft wire 橡皮绝缘聚氯乙烯护套控制电缆 PVC sheathed rubber insulated control cable 橡皮绝缘低压腊克线 Rubber insulated low voltage lacquer wire 尼龙管缆 ,单芯高压聚氯乙烯护套 High pressure polyethylene sheath cable singlecored nylon tubing 塑料护套塑料绝缘控制电缆 PVCsheathed and PVCinsulated control cable 自控设备表 (表一 ) L。机械仪表]仪表工程师专业英语汇总
相关推荐
INC DPTR MOV A, 0DH ; A 为 00001101 MOVX @DPTR,A ; PB 口的 PB1 南红灯亮,因此东西绿灯亮,南北红灯亮 MOV R2, 55H LCALL DELY ;延时 MOV R7,05H ;闪烁次数 JOD1: MOV DPTR, 0FF28H MOV A, 0F3H MOVX @DPTR, A ; PA 为 11110011,即 PA3 北红、
2、旺。 今年我市小麦苗情普遍较好,但部分田块由于播种质量不高,施肥不足,小麦冬前群体较小,分蘖较少。 对这一类田块要紧紧抓住返青期苗情转化较快的有利时机追施速效氮肥,一般亩追施尿素 510 公斤,促进苗情尽快转化升级,对于一般小麦田块,重点推广氮肥后移技术,因地制宜,施好拔节肥。 对部分群体较大,有旺长趋势的田块,以控为主,积极采取碾压和深中耕等措施,抑稠控旺。 还可以在小麦起身期,每亩喷施
应的变化,这种方法简单易实现,但是滴管长度有限,而且受制于受液瓶的高低,控制起来会有许多不定因素。 所以我们不选用此方案。 方案二:采用凸轮来控制滴管的松紧,这样滴速 一定会发生相应的变化,这种方案在执行元件的选取上要花费脑筋,但优点是控制较精细,调整较迅速,稳定性也比较好,所以我们选用凸轮来控制。 主从机通信方式选择 方案一:采取并行方式。 并行的传输方式需要的传输线很多而且成本高
2、高产的需要;(4)漏得最严重的地方是颗粒输送带下的杂余兜子,按规定该倒不倒,装满自溢;有的杂余收集器经过改装后,四周封闭不严。 3、割台损失即在收割过后,遗留在地上的残株麦穗、籽粒等,称为割台损失。 产生该损失的主要原因是:(1)收割台高低调整不当,割茬高。 由于气候条件影响,小麦高低不一,因此漏割的穗头多。 (2)机组转弯处圆角太小,漏割多;(3)拔禾轮的高低和转数调整不当