20xx人教版英语七年级下册unit12whatdidyoudolastweekendsectionb第一课时课件内容摘要:

did her homework 1c studied for a test went to the library sang and played the guitar flew a kite had dinner with friends Make a conversation with a partner. Talk about what Sally and Jim did last weekend. Who went to the library? Sally did. 1d Did Sally go out on Saturday? No, she didn’t. She did her homework and studied for a test. The。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。