20xx人教版英语七年级下册unit11howwasyourschooltripsectionb第二课时课件内容摘要:

每个东西都是关于机器人的,我对此不感兴趣。 be interested in 对 …… 感兴趣 例如:我们对英语感兴趣。 We are interested in English. 辨析 :interested/interesting interested 人对事物感兴趣 事物本身 有趣 interesting 用于句型be(bee) interested in 可作定语和表语 用 interesting / interested 填空。 1. The book is very _________. Most of the teachers are _________in it. 2. The boy has much _________ in drawing. 3. 3岁的时候,他开始对音乐产生了兴趣。 He ______ _________ _______music when he was 3 years old. interesting interested interested was interested in 我对收集邮票很感兴趣。 I am interested in collecting stamps. 那是一本很有意思的书,你一定要读读。 That is an interesting book, you must read it. 辨析 :interested/interesting 3. I didn’t like the trip at all. 我一点都不喜欢这次行程。 not at all / not… at all 根本不;完全不 I don’t like mutton at all. 我 一点都不 喜欢羊肉。 She’s not at all good at badminton. 她 完全不 擅长打羽毛球。 3a Look at the pictures of Bob’s school trip. Complete his diary entry. June 23rd Yesterday my school visited the zoo. It was really __________. We went there by bus. At the zoo, I saw a lot of __________ and I took some photos. My classmates and I also went to the _____。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。