汽机施工组织设计(英(编辑修改稿)内容摘要:
India Amarkantak Power Plant Project Construction Engineering Rev:0 7 SL. NO. NAME UNIT QUANTITY DEVICE OPERATED TURNING GEAR SET 1 TURBINE BYPASS EQUIPMENT HIGH PRESSURE BYPASS EQUIPMENT SET 1 LOW PRESSURE BYPASS EQUIPMENT SET 2 BOILER FEEDWATER PUMP SET 3 DEAERATOR SET 1 LIQUID MECHANICAL VACUUM PUMP SET 2 BALL CLEANING PUMP SET 2 BALL COLLECTOR SET 2 BALL STRAINER SET 2 OIL STORAGE TANK SET 1 DRAIN FLASH TANK FOR AUX. STEAM SET 1 AUX. STEAM HEADER SET 1 CONDENSATE WATER STORAGE TANK SET 1 CONDENSATE WATER TRANSFER PUMP SET 2 Generator SET 1 INCLUDING SEAL OIL SYSTEM , HYDROGEN COOLER ETC. CHEMICAL TREATMENT CHEMICAL DOSING SYSTEM SET 1 WATER amp。 STEAM SAMPLING SYSTEM SET 1 CONDENSER POLISHING SYSTEM SET 1 India Amarkantak Power Plant Project Construction Engineering Rev:0 8 SL. NO. NAME UNIT QUANTITY Iamp。 C SYSTEM Distributed Control System (DCS) SET 1 DEH (turbine digital electrohydraulic control system) SET 1 ETS (turbine protection system) SET 1 Turbine Supervisory Instrument( TSI) SET 1 Boiler furnace gas temperature probe control system SET 1 Boiler Soot Blowing Control System SET 1 Boiler Power Control Valve (PCV) Control Device SET 1 Required construction time limit According to the special clauses of the contract signed by China and Iran, the first generator unit is put into operation in the fortyfourth month after the contract execution of contract (Date of execution of contract is Janauryr 11, 20xx)。 the second unit is put into operation after 6 months of unit 1. No. Content Start End 1 Site survey 20xx101 2 Main building, boiler and equipment foundation construction 20xx0215 3 Civil and structure works 20xx0114 4 Boiler steel structure erection 20xx0701 5 Steam drum lifting 20xx1130 6 Turbine erection 20xx0201 Turbine casing covering 20xx0630 7 Coal pulverizing system 20xx0130 8 Generator erection 20xx430 9 Condenser erection 20xx122123 10 Boiler hydraulic test 20xx57 11 Boiler firing and steam blowing 20xx101 12 Oil circulation 20xx96 13 Turning gear 20xx1022 14 Turbine rotor rolling 20xx1211 15 Synchronization 20xx111 India Amarkantak Power Plant Project Construction Engineering Rev:0 9 Commercial operation 20xx031 16 Performance test 20xx31 20xx61 NO. items Beginning time Completion time 1 地质勘探及试验 20xx1001 2 主厂房、锅炉及设备基础施工 20xx0115 3 土建及结构工程 20xx0114 4 锅炉钢架安装 20xx0701 5 汽包起吊 20xx1130 6 汽机安装 20xx0201 汽机扣盖 20xx0630 7 煤粉制 备系统 20xx0130 8 发电机安装 20xx0430 9 凝汽器安装 20xx1212 10 锅炉水压试验 20xx0507 11 锅炉点火吹管 20xx1001 12 油循环 20xx0906 13 TG盘车 20xx1022 14 汽机冲转 20xx1211 15 并网 20xx0111 商业运行 20xx0301 16 性能试验 20xx0301 20xx0601 India Amarkantak Power Plant Project Construction Engineering Rev:0 10 3. Organization mechanism and its duty Organization mechanisms The owner of the project is LANCO AMARKANTAK POWER PRIVATE LIMITED HYDERABAD – INDIA and ZELAN PROJECTS PRIVATE LIMITED as principal contractor roundly takes charge of design, equipments, construction, missioning and operation, etc. ChinaDongfang Electric Corporation(DEC) as subcontractor takes charge of design, equipment manufacturing and supply, installation supervision and technical instructor of the project. Construction anization mechanism is shown in Fig. 1. Management duty Duty of ZELAND Roundly take charge of design, equipments, construction, missioning and operation, etc. Duty of DEC Takes charge of design, equipment manufacturing and supply, supervision of installation and necessary technical instruction of the project. Duty of erection supervisor and technical instructor Provide reference documents of construction and technology and assure they are exact. Prepare the project quality inspection amp。 evaluation item lists and acceptance sheets. According to “Control Procedure of Construction Process”, take change of supervision and instruction of erection quality, procedure and safety. Help subconstrictors of ZELAND perform selfcheck and cooperate with ZELAND perform check and acceptance of erection quality. Help zeland manage general plane of erection site. Help zeland perform the safety management of erectoin site. According to the procedure of erection, help zeland arrange the time of entering construction points of erection anizations and relevant personnel. Duty of construction subcontractor Prepare work instructions, construction technical schemes and working plans of all specialties. India Amarkantak Power Plant Project Construction Engineering Rev:0 11 Perform erection working according to the approved erection plans, quality plans, erection instructions and erection task sheets and provide technical records that conform to the requirements. Take charge of quality acceptance of grade 1 and 2 specified in quality acceptance item list. Take charge of preparing the demand plan of the materials. Take charge of marking the materials and equipments in the erection process. Put forward the training requirements of welding worker, heat treatment worker special working personnel and other personnel. Prepare enough labor force with qualification and construction machines and tools to assure reaching schedule and quality target specified in advance. Take charge of protecting all the finished products in the contracting range during construction. Take charge of routine maintenance and service of construction machines and equipments. Take charge of safety and civilization construction in the construct。汽机施工组织设计(英(编辑修改稿)
相关推荐
............................................... 7 3 项目实施 ...................................................................................................................................... 7 实施方案
#溶剂油。 此外,还有油墨溶剂油、干洗溶剂油等。 有时,馏程的切割各个企业也会有所不同。 通常, 溶剂油 可以分为主要用在抽出大豆油、莱籽油、花生油和骨油等动植物油脂的抽提溶剂油,用于橡胶、鞋胶、轮胎等领域的橡胶溶剂油,用于油漆、涂料工业的油漆溶剂油,等等。 此外,还有洗涤溶剂油、油墨溶剂油等。 根据国家标准 《 油漆及清洗用溶剂油 》 GB192220xx,即按其98%馏出温度或干点划分溶剂油
临时用电布置 项目部 准备 接入 1 号桥西北侧的 变压器,临时用电从变压器引出。 变压器容量、导线截面和电器的类型规格: 根据负荷计算与现场实际用电的分配情况,本工程业主在施工现场 安装 1 台变压器做施工电源,用电主干线为 YHS 型( 3 252+102)橡胶电缆。 第 四 节 试验室及主要生产设施布置 现场设立一间面积不小于 15m2标准养 护室。 现场混凝土采用商品混凝土
法律文书大全范本 鲤鱼网成功在于执着法律文书格式及应试技巧精讲对策:在浩如烟海的格式中抓出规律,使零散而繁杂的格式变得易记;搞清常考的不同文书的特点,做到准确命题;记一些成文化用语,使表述规范且节省构思时间;掌握重要文书的写作要素,记清注意事项。 格式选编:一、一审刑事附带民事判决书×××人民法院刑事附带民事判决书(一审公诉案件适用普通程序用)(××××)×刑初字第××号公诉机关×××人民检察院
养老院老年人保健养生 养老院老年保健养生应做到四平衡,老年人只有按照健康有序的执行养生计划,并持之以恒,才能保证老人健康的生活。 平衡包括老人运动 忆 养老院老年保健的 衡、老年饮食平衡、老年起居平衡及老年心理平衡,做到这四平衡,有助于老人更加健康养生。 1.老年运动平衡 养老院老年人子啊锻炼身体时,不可过量度的疲劳,老年人在运动后需要进行合理的休息,平时做些力所能及的家务事
位于国家第一个生态经济示范区池州市贵池区西南 50 公里处,东距铜陵长江大桥 35 公里,西离安庆长江大桥 60公里;北依长江,南邻安徽沿江高速公路和沿江大动脉铜陵 — 九江铁路。 自然气候、水文 地处暖温带与亚热带的过渡地带,属亚热季风性湿润气候区。 气候温和,雨量适中,光照充足。 全年冬寒、夏热、春暖、秋凉,四季分明,季风明显。 光、热、水资源丰富,气候温和,光照充足,无霜期长