20xx外研版英语九年级下册module7englishforyouandmeunit1课件内容摘要:

glish well is to practice speaking it as often as possible. A: I think so. Anything else? B: Try to write a few sentences about your day and then speak them out as many times as possible before you go to sleep. A: Good idea. Thanks. Presentation 1. Progress n. 进步 (不可数名词 ),常用 rapid, great,much, some等修饰词。 1) make progress 取得进步 make great progress 取得很大进步 How much progress have you made? 2) make progress in (doing) sth 在 (做 )某事取得进步 I have made great progress in maths this term. I made rapid progress in speaking English. 单词讲解 Consolidation 2. achieve v. 成功;实现 (主语是人 ) achievement n. 成就 achieve success / victory / one’s dream 取得成功 / 胜利 / 实现某人的梦想 At last, he achieved his dream. No one can achieve anything without effort. e true 主语是梦想、蓝图、计划等。 Your dream will e true one day. Consolidation 3. anyway adv. 无论如何;不管怎样 Anyway, he must have eaten a lot because now he is fat. 4. written English 英语书面语 spoken English 英语口语 English – speaking 说英语的 How can I improve my spoken English? I want to travel to English– speaking countries. Consolidation 5. keep doing sth. = go on doing sth. 继续做某事 6. fun n. 快乐;乐趣 (不可数名词 ) have fun 玩得开心 have fun (in) doing sth. 做某事有趣 We had fun in riding our bikes to the beach today. Consolidation 7. continue to do sth. 继续做某事 continue doing sth. continue with sth. 8. you mean 你意思是说,你指,用在口语中,用于 核实 某人所说的话。 You mean I must finish it before I go home? Consolidation 9. thought 原以为 (但实际并非如此或现在不认为 )。 I thought he was honest, but I’m wrong. 10. including prep. 包括,后接名词 /代词 /动名词。 Ten boys attended the meeting, including myself. include v. 包括 Our plan includes most of your suggestions. Consolidation ’t need to do sth. = needn’t do sth. 不需要做某事 不必做某事 12. speak to sb. 和某人说话 / 通话 May I speak to Tom? 13. at the same time 同时 Consolidation 14. help sb with sth. = help sb (to) do sth. with one’s help = with the help of sb. 在某人的帮助下 15. in the future 在将来 in future = from now on 今后 I want to be a doctor in the future. Don’t do that thing in future. Consolidation Language points 1. I think I’ve achieved a lot. achieve v. 达到;取得 通常表示 ―实现梦想 , 获得成。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。