20xx外研版英语九年级下册module4rulesandsuggestionsunit2课件1内容摘要:
eg: I hung the washing on the clothing line. 我把洗好的衣服挂在晾衣绳上。 At last, the bad man was hanged. 最后,这个坏男人被绞死了。 My bag ________ there behind the door. A. hanged B. hang C. is hanging D. has hanged 典例 C hang sth. with eg: The rooms were hung with drawings. 这些房间用图画装饰着。 拓展 知识点 5 in a/the tree在树上 eg: Look。 There is a kite in the tree. 看。 那棵树上有一个风筝。 考向 辨析 in the tree与 on the tree in the tree (外来的事物 ) 在树上 There is a bird in the tree.树上有一只鸟。 on the tree (树本身的东西,如花、果实等 )在树上 There are some apples on the。 魔法记忆 魔法记忆 in the tree on the tree 知识点 6 put up搭建 eg: We put up our tent in the woods. 我们在树林里搭起我们的帐篷。 考向 put up的不同含义 put的相关搭配 put off 推迟;拖延 put down 放下;写下 put away 放好 put on 穿上 put out 扔掉;扑灭 考向二 put The little child________the toys and went for dinner. (嘉兴 ) A. put on B. put up C. put off D. put away 典例 D 【 点拨 】 put on“穿上”; put up “举起,张贴,搭建”:put off“推迟”; put away“放好,收好”。 句意为“这个小孩放好玩具去吃饭了。 ”故选 D。 知识点 7 reach out伸出 eg: He reached out his hand to touch her. 他伸出他的手去摸她。 考向 reach有多种含义: 用作动词,表示 “到达 ”。 When did you reach Beijing? 你什么时候到达北京的。 用作动词,表示 “伸;伸手 ”。 He reached inside his bag for a pen. 他 把手伸到包里掏钢笔。 用作动词,表示 “够得着;能伸到 ”。 The book is on the top of the shelf— I can39。 t reach it. 这本书在书架的顶端 ——我够不到它。 —Bill, will you get me the dictionary on that shelf, please? —I’m afraid I can’t ________ it, ’s too high. (丽水 ) A. find B. reach C. sell D. read 典例 B 【 点拨 】 reach在此处表示 “够得到 ”。 知识点 8 still/stɪl/;寂静的;不动的 eg: I think it39。 s very hard for kids to stay still. 我认为对小孩子来说保持不动很难。 考向 辨析 calm, quiet, still与 silent calm 平静的 指人的心情不激动;指天气、海洋等的风平浪静。 quiet 安静的 指没有噪音,不吵闹或心中没有烦恼、焦虑。 still 静止的 侧重指完全不动或没有声响。 silent 寂静的 指没有声音或不讲话。 3 Complete the table. What happened What they should or should not do In the middle of the first night, the writer heard a______________ the bag of food___________. They should _______________________. During the second night, the bears came again and______________ from the tree. They should _________________________ and______________________. On the fourth day, the writer saw_________________________ _________________________. Then _________________came. She should not ____________. stra。20xx外研版英语九年级下册module4rulesandsuggestionsunit2课件1
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。