20xx人教版高中英语必修四unit3atasteofenglishhumour6内容摘要:

ould speak and as soon as he could walk. Teens Charlie became one of the most popular child ______ in England through his . died worse off sing danceactors humour I’m Charlie Chaplin. What do you know about me? Careful reading Charle Chaplin Was born in His job is In 1972, he was given Type of acting is His charming character is His costume: Reasons of success: He died in in 1889 an actor mime and nonverbal humor. The Little Tramp large trousers, wornout shoes and small round black hat. a special Oscar for his outstanding work. He could astonish and inspire us skillfully. 1977 Switzerland. a small black hat a moustache a stick very wide trousers He wore a small black hat, very wide trousers, and a moustache . He carried a stick that he swung in the air as he walked. Give a description on the little tramp 1. Why was the little tramp loved by people? He was loved for his optimism and determination to overe all difficulties and he was also kind even when others were unkind to him. 2. Give a description of the little tramp, Chaplin’s famous character. He wore large trousers, wornout shoes and a small round black hat, carrying a walking stick. 3. Which film of Chaplin is mentioned in ? The Gold Rush. Time : Place : Job in the film : in the middle of the 19th century California, USA panning for gold What troubles did they meet in California? They ____________。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。