20xx春鲁教版英语八下unit1whenwashebornppt课件3内容摘要:

show about people with great talents. I really admire this guy. T: Who is he? A: He’s a street artist. He paints pictures on the ground or buildings. T: The pictures look so real and 3D! A: Yes, the pictures are flat, but they look like they’re 3D. T: When did he start painting these pictures? A: I think he started about five years ago. T: how old was he when he started doing this? A: Hmm…I guess he was about 20 years old when he started. He was still a college student. He sometimes got in trouble for painting the buildings at school! T: I wonder if I can learn to paint like that. It’s so cool! A: Well, I’m sure you can. T: Hey, Andy. What are you _________? A: Oh, it’s a show about people ____________. I really _______ this guy. T: Who is he? A: He’s a __________. He _____________ on the ground or buildings. T: The pictures look _________ and 3D! A: Yes, the pictures are flat, but they _________ they’re 3D. T: When _________________ these pictures? A: I think he started __________________. T: how old was he _____________________? A: Hmm…I guess he was about 20 years old _____________. He was still a college student. He sometimes ___________ for painting the buildings at school! T: I wonder ___________________. It’s so cool! A: Well, I’m sure you can. 阿尔弗雷德 伯纳德 诺贝尔( Alfred Bernhard -),是瑞典化学家、工程师、发明家、军工装备制造商和炸药的发明者。 Do you know anything about the Nobel Prize? 诺贝尔生前的确拥有 Bofors (卜福斯)公司。 此公司拥有 350年历史,此前主要生产钢铁。 诺贝尔拥有Bofors后把公司主要产品方向改为生产军工产品。 在第二次世界大战中该公司多项产品曾授权多国生产,并受军队广泛好评。 诺贝尔一生拥有 355项专利发明,并在欧美等五大洲 20个国家开设了约 100家公司和工厂,积累了巨额财富。 在他逝世的前一年,立嘱将其遗产的大部分(约 920万美元)作为基金, 将每年所得利息分为 5份,设立物理、化学、生理或医学、文学及和平 5种奖金(即诺贝尔奖),授予世界各国在这些领域对人类作出重大贡献的人。 其中炸药为最为出名的一项。 人造元素锘( Nobelium)就是以诺贝尔命名的。 诺贝尔奖,是以瑞典著名的化学家、硝化甘油炸药的发明人阿尔弗雷德 贝恩哈德 诺贝尔的部分遗产( 3100万瑞典克朗)作为基金创立的。 诺贝尔奖分设物理、化学、生理戒医学、文学、和平五个奖项,以基金每年的利息戒投资收益授予前一年世界上在这些领域对人类作出重大贡献的人, 1901年首次颁发。 诺贝尔奖包括金质奖章、证乢和奖金。 1968年,瑞典国家银行在成立 300周年之际,捐出大额资金给诺贝尔基金,增设“瑞典国家银行纪念诺贝尔经济科学奖”, 1969年首次颁发,人们习惯上称这个额外的奖项为诺贝尔经济学奖。 莫言,原名 管谟业 Who is this man? What is he? Do you know these two books? What are the names of the books in English? Mo Yan. His real name is Guan Moye. pen name He is a writer. They’re Mo Yan’s works, his novels. shun frog 莫言,原名管谟业, 1955年 2月 17日生,祖籍山东高密,是第一个获得诺贝尔文学奖的中国籍作家。 他自 1980年代以一系列乡土作品崛起,充满着“怀乡”以及“怨乡”的复杂情感,被归类为“寻根文学”作家。 2020年,莫言的 《 红高粱 》 入选 《 亚洲周刊 》 评选的“ 20世纪中文小说 100强”。 2020年 《 檀香刑 》 全票入围茅盾文学奖初选。 2020年莫言荣获茅盾文学奖。 2020年莫言获得诺贝尔文学奖。 2020年 10月 30日,中国首家培养网络文学原创作者的公益性大学“网络文学大学”开学,莫言担任该校的名誉校长。 2020年 12月 6日,莫言获颁授澳门大学荣誉文学博士学位。 Fast reading 1. What did Mo Yan say when he heard the news that he won the Nobel Prize? 2. What did little Mo Yan read when he couldn’t find any more books? 3. When did Mo Yan bee a famous writer? 4. What other prize in literature did Mo Yan win besides the Nobel Prize? He said he never expected to win the prize, as there were so many good writers over the world. He read a Chinese dictionary. In 1987. He also won the 18th Mao Dun Literature Prize in 2020. when What he did 1955 dropped out of school 1976 1981 2020 was born in Gaomi, Shandong 1967 joined the army his first short story was published won the Nobel Prize in Literature When he heard the news, Mo said he never expected to win the prize, as there were so many good writers all over the world. as 在句中作连词,引导原因状语从句,以“因为;由亍”。 辨析: because。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。