20xx秋科普版英语五上lesson10thereisahorseunderthetreeppt课件4内容摘要:

are eating What’ s on the table? There are two apples on it. What’ s in the tree? There is a kite in it. What’ s on the table? There is a teddy bear on it. What’ s on the wall? There are five photos on it. What’ s under the tree? There is a cat under it. What’ s under the tree? There is a cat and two hens under it. There are two hens and a cat under it. There is an apple on the chair. There are three pencils in the pencilbox. There are some fruits in the fridge. There is a dog and two cats on the bed. There are two cats and a dog on the bed. 1. There some books and a pen on the desk. 2. There is a kite the tree. 3. There a tomato, two cabbages and a carrot in the fridge. 4. There a fruit shop near the house. 5. beside the puter? There is a mouse beside it. __ _some sheep in front of t。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。