农学与生物技术专业毕业设计论文-不同玉米品种的根系活力与产量性状关系的初步研究内容摘要:
Yan( Beijing Agricultural University, Beijing100094) Abstract:Systematic electrophoresis analysis of albumins and globulins of the inbred and hybrid corn ( Zea mays) seeds was carried out on an improved lactatepoly acry lamide gel electrophoresis, a method with high resolving power , good reproducibility and stability. The elect roph regram w as classified into four groups designated as , and! Respectively。 Each inbred or hybrid had its own unique band pattern distinguishable from the others, regarding as its fingerprint . T he band pat tern of the whole kernel was basically similar to that of its embryo, except t hat of the endosperm showing less bands wit h weaker staining intensity。 and most of the patterns overlapped wit h t hose of the embryo. T he band number of the F1 hybrid w as exactly equivalent t o the number of t he mon bands and the specific bands of t he two parent s, indicating that the difference of band patterns w as a geic trait controlled by t he nuclear genes. T he F1 elect rophoregram could be predicted by t hose of the two parent s. T he band pattern of t he F 1 11 hybrids was identical with t hat produced from me chanically mixed extract of t he two parent procedure could be used in corn cultivar identification and as a test f or geic purity. Key words: Corn。 Albumin。 Globulin。 Polyacrylamide gel electrophoresis。 Varietal identification Zein is the main ponent of corn seed proteins. It consists of a number of polypeptides of similar molecular weight but with considerable heterogeneity in bioelectric point, so electrophoresis especially isoelectric focusing ( IEF) analysis of the zein family had been extensively used f or corn cultivar identification. Different genotypes containing between 8 to 15 ponents has been identified from t heir zein bandpatterns on the isoelectric focusing electrophoregram. The zein IEF pat tern has been regarded as a geic marker. The IEF w as also used in mapping of genes coding for zein. However, t he zein IEF pattern does not have enough capacity in differentiating between hybrids and their female inbred parents. Certain band differences could be detected among the inbred by using SDSPAGE procedure to analyze proteins extracted from t he seeds and seedlings, but this difference was influenced by t he buffer solution. From the prehensive survey of irony me variability in corn inbred and hybrids using SGE to fractionate proteins from 5day old coleoptiles tissue and staining f or 12 is enzymes, 88 out of 113 ( 80% ) public inbred being utilized in Canadian hybrids and 146 out of 155 ( 94% ) mercial hybrids w ere distinguished by using SDSPAGE procedures. T he heterogeneity of the album ins and goblins of corn seeds w as also used t o identify part of the corn inbred and hybrids. All of t he abovementioned electrophoresis procedures were carried out under basic pH condition. Wang et al. first used t he gradient palmary limed eagle electrophoresis to analyses the 1 mol/ L urea ex tract able proteins of corn seeds under acid pH condition and had been highly praised f or t he possible validity of t his method f or corn seed purity testing. An acid lactatePAGE procedure has been developed in our laboratory as a basic method of w heat cultivar electrophoresis identification. T his procedure was preliminarily proved t o be suit able for separating corn albumin and globulin fractions. The aim of t his study was to evaluate the feasibility of this procedure in distinguishing different corn genotypes, its resolving power, stability, reproducibility and t he geic expression of parent inbred in term s of band patterns in their F1 hybrids, so as t o explore the possibility of its application on corn geic purity testing and cultivar identification. 1 MATERIALS AND METHODS Sample preparation A tot al of 141 inbred and 153 hybrids of corn ( Zea mays) were studied. T he former prised of 9 high oil inbred developed from Illinois high oil ( IHO) C80, 14 high oil inbred from Alexon high oil synthetic C23, and 6 sweet corn inbred from a mercial single 12 cross of Rogers Seed Co. T he latter prised of 26 hybrids w it h on female parents but different male parent s, and 16 w it h mon male but different female parents. All seed samples were provided by our own laboratory . A single corn seed w as ground w it h a sing le seed mill or soaked in tap water under 0 ℃ overnig ht , after which t he embryo and endosperm w ere dissected with a razor blade. After naturally dried, the embryo or endosperm was g round separately. T he ground powder w as put into 2. 5mL centrifuge tube, w it h t he addition of equalvolume of ex tract ion solution( 0. 5 mol/ L NaCl, containing 15% sucrose and 0. 05% methyl green) , mixed thoroughly and extracted for 1 h at room temperature, then centrifuged at 4000 r/ min f or 5 min. The supernatants were used f or electrophoresis. Preparation of the working solutions T he stock solution, tank buffer, separation gel and concentration gel w ere prepared according t o the proportion and volume in T able 1. Table 1 Recipes for stock, extraction and buffer solutions Stock solutions Mixed ratio 1 .A crylamide 95 g, Bisacrylamide 3. 8 g, distilled water 500mL 2. Sodium lactate2. 81mL+lacticacid to pH。农学与生物技术专业毕业设计论文-不同玉米品种的根系活力与产量性状关系的初步研究
相关推荐
点,组织开展 岗位技能、服务质量和作业标准的培训。 五是农机新技术、新机具宣传力度进一步加大。 利用科技服务三下乡活动等多种形式的科技宣传和服务活动,发放农机政策、法规和农机新技术新机具简介、机具操作方法、操作规范等宣传资料 3 万多份。 在关键生产季节开展农机服务活动,面对面帮助农民解决生产生活中的困难和问题,帮助农民维修农业机械 2020 多台件,激发了带动农民学科学、用科学的积极性
人的保证能力和抵(质)押物的合法性、真实性。 (六)测定贷款风险度。 3对借款人的信用分析一般包括哪些内容。 (一)借款人品格,即分析借款人是否有清偿债务的意愿、是否有良好的经营记录; (二)借款人能力,重点分析借款人的还款能力; (三)借款人资本,分析借款人资本金质量及雄厚程度; (四)借款人担保,分析担保对贷款债权的保证程度; (五)借 款人经营环境。 3资产负债表审查分析的内容主要有哪些。
时,收款员在缴款凭证上套写“短款元已补”字样。 ( 2)按实际金额重新填制凭证。 客户交存现金与凭证金额不符,可由交款人自行复点确认后按实际点交金额,重新填写凭证。 ( 3)长款不退,补制凭证。 确认长款时,可由交款人将其长款部分,另行补制凭证(并作详细说明)。 ( 4)客户交款有误,不论长款或短款,信用社出纳员都应在“单位交款差错登记簿”上做详细记载,并由交款人签章备 查。 考试资料网 @
共办理抵押贷款 *笔,抵押贷款金额为 *万元。 (4)实行了流转粮收购最高限价管理办法。 根据省行不同时期下发的信贷支持参考价格,我行及时调整贷款投放标准。 四季度,我部先后两次调整信贷支持价格,水稻由原来坚持 *元 /斤调整到 *元 /斤;玉米由原来 **元 /斤;大豆由 *下调到 *元 /斤;超出支持价格的资金由企业自行解决。 ⑹坚持贷款申请报账制。 信贷员按日核打企业收购码单
签订的委托合同。 研究工作的范围 根据国家对基本建设项目可行性研究的内容和深度要求,重点研究以下内容: 分析研究项目的产业政策,市场导向,投资环境和可行性; 项目建设的资源环境,社会和实施配套条件; 确定项目的建设内容,建设规模和实施方案; 估算项目建设投资和安排资金作用计划; 计算和评价项目的经济效益。 项目建设的必要性 符合国家的产业政策 应对加入 WTO 的挑战,增强企业的竞争力
1、最新农副产品和食品加工技术护色糖水草梅罐头的加工(一)工艺流程 原料选择清洗去果梗热烫抽空染色漂洗装罐密封杀菌冷却擦罐检验 (二)工艺要点 择果实完整,大小基本一致,色泽鲜红,新鲜度高,风味正,八成熟的果实作原料。 剔去病虫果、青绿果和僵化果。 2清洗 用流水漂洗,除去果实表面的泥沙、污物等。 生长期内喷过农药的,更要注意用洗果液彻底漂洗,除净残留农药。 3去果梗 择去果梗、萼片。