module1lifeinthefutureperiodtwo课件外研版必修4,课标通用内容摘要:

ok over翻阅;浏览 look through审核,浏览;仔细察看 look up仰视;查阅 用含有 look的动词短语填空 ① Would you mind________my baby for a while I39。 m out? ② Tell the children to________when they cross the main street. ③ The rich man________his poorer neighbour. ④ He________several newspapers before breakfast every day. 答案 ① looking after ② look out ③ looks/looked down on ④ looks through 2. on the way out即将被淘汰,即将过时 You must work hard at science and technology, or you will be on the way out. 你必须努力学习科技,否则你就会被淘汰。 【 归纳拓展 】 by way of经由;途径 in a way在某种程度上 in the way挡道,妨碍 in no way绝不 No way。 没门儿。 【 友情提示 】 on the way即将去 (或来 );在路上。 后面常接介词 to或副词home/there/here等; in no way 为表示否定意义的短语,位于句首时,句子用倒装结构。 The letter should be on its way to you. 那封信该在路上了。 I got caught in a heavy rain on the way home. 我在回家的路上遇到了一场大雨。 In no way should you tell him the truth. 你绝不可以告诉他真相。 【 完成句子 】 ①这种老虎即将灭绝。 This kind of tiger is____________. ②快要下大雨了。 A heavy rain is____________. ③他即将成为一名医生。 He39。 s______________________a doctor. 答案 ① on the way out ② on the way ③ on the way to being 3. be busy(in)doing...忙于做某事 He is busy (in) preparing for the ing examination. 他正忙着为即将到来的考试做准备。 【 归纳拓展 】 be busy with sth忙于某事 She is busy with her new。 【 翻译句子。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。