外研版高中英语必修1module3myfirstrideonatrain之四内容摘要:

ionary查词 典 • ① In his speech, he didn’ t refer to the problem at all. • 在他的演说中,丝毫未涉及那个问题。 • ② When I said someone was foolish, I wasn’ t referring to you. • 当我说有些人很愚蠢时,我并不是指你。 • ③ It was foolish of him to refer to his notes in the big exam. • 他在重要考试中参考讲义,真是愚蠢。 • ④ Johnson referred to the discovery as a major breakthrough in medical science. • 约翰逊称这项发现是医学领域里的一个重大突破。 • 1. It was foolish of him to________his notes during that important test, and as a result, he got punished. • A. stick to B. refer to • C. keep to D. point to • 【 解析 】 句意为:在那次重要考试中他竟愚蠢地看他的笔记,他因此而受到了惩罚。 refer to参考,查阅。 • 【 答案 】 B • 2. The president spoke at the business meeting for nearly an hour without________his notes. • A. bringing up B. referring to • C. looking for D. trying on • 【 解析 】 此题考查动词短语辨析。 bring up抚养长大; refer to参考,参照;look for寻找; try on试穿。 句意为 “ 主席在大会上发言近一个小时,没有参考演讲稿 ”。 • 【 答案 】 B • 3. There are so many new words in this article that I can’ t get along without________the dictionary. • A. sticking to B. referring to • C. looking up D. putting up • 【 解析 】 refer to意为 “ 参考,查阅 ”。 stick to意为 “ 坚持 ” ; look up意为 “ 查阅 ” ,常用于 look up the dictionary结构中, put up意为 “ 修建 ”。 句意为 “ 这篇文章有太多生词,以致我不查词典就读不下去 ”。 • 【 答案 】 B • 4. It was at this point that her acting career really________. • A. took up B. took off • C. took in D. took down • 【 解析 】 这是个强调句,句意为:就是在此时她的演艺事业开始腾飞。 • 【 答案 】 B • 5. After he retired from office,Rogers________painting for a while, but soon lost interest. • A. took up B. saved up • C. kept up D. drew up • 【 解析 】 由后置语境 but soon lost interest可知空白处应表示 “ 对 „„ 产生兴趣 ” , take up可以表示 “ 对 „„ 产生兴趣 ” ,故 A项符合语境。 save up表示 “ 储蓄 ” ; keep up表示 “ 使 „„ 不掉下来 ” ;draw up表示 “ 起草,拟订 ”。 • 【 答案 】 A • 6. The plane________at 10∶ 00, so you must try to be at the airport by 9∶ 00. • A. takes off B. is taken off • C. took off D. is being taken off • 【 解析 】 take off意为 “ 起飞 ” ,为不及物短语动词,不用于被动语态。 转移动词的一般现在时常表示按时刻表安排好的将要发生的动作。 句意为 “ 飞机在十点钟起飞,所以你必须在九点赶到机场 ”。 • 【 答案 】 A • 1. Where ________ ________ ________most of the people live, in the central part of the country or on the coast? • 你认为大多数人生活在哪里,国家的中部还是沿海。 • 【 答案 】 do you think • 【 答案 】 Would you mind • 3. Ghan________ ________ ________Afghanistan. • Ghan是阿富汗的缩写形式。 • 【 答案 】 is short of • 4. It’ s________ ________ ________.这过时了。 • 【 答案 】 out of date • Where do you think most of the people live, in the central part of the country or on the coast? • 你认为大多数人生活在哪里,国家的中部还是沿海。 • do you think是插入语,位于疑问词之后,而且其后面要用陈述句语序。 其结构为:特殊疑问词+ do you think+陈述句语序。 除 think之外,还有 believe,。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。