外研版高中英语必修1module2mynewteachers之七内容摘要:

school last week, with the result that she missed an important 拉上周没上学,结果错过了一次重要考试。 • ④ His carelessness resulted in the terrible accident. • = The terrible accident resulted from his carelessness. • 那桩可怕的事故是由于他的疏忽大意而引起的。 • 1. (2020年全国卷 Ⅱ )Jenny nearly missed the flight________doing too much shopping. • A. as a result of B. on top of • C. in front of D. in need of • 【 解析 】 句意为:由于买了太多的东西, Jenny差点误了航班。 as a result of由于 „„ 的结果; on top of在 „„ 顶部; in front of在 „„ 前面; in need of需要,由句意知 A项正确。 • 【 答案 】 A • a bit稍微,有点儿 • ① The peach is a bit。 • ② Can you speak a bit slowly。 你能说得稍微慢点吗。 • 辨析: a bit与 a little • (1)a bit和 a little用在肯定句中修饰形容词或副词时,基本可互换使用。 • I feel a bit/a little 饿。 • (2)修饰名词时, a bit of+ n.= a little+n.。 • I want to drink a bit of water. • = I want to drink a little 儿水。 • (3)not a bit 一点也不; not a little 很,非常 • She is not a bit tired while I am not a little tired. • 她一点也不累,而我却很累。 • 1. My friend Martin was very sick with a strange fever, ________he could neither eat nor sleep. • A. as a result B. after all • C. any way D. otherwise • 【 解析 】 此题考查副词短语辨析。 as a result结果,符合前后句之间的因果关系;after all毕竟; any way无论如何,不管怎样;otherwise否则。 根据语境,故 A项正确。 • 【 答案 】 A • 2. Please tell Tom not to leave the classroom unless he ________ that all the lights ________. • A. makes sure; are turned off • B. makes sure; will turn off • C. is made sure; are turned off • D. will make sure; will be turned off • 【 解析 】 本题考查 unless引导的条件状语从句及短语 make sure。 unless引导条件状语从句时,谓语动词用一般时表将来,因此排除 D;因为 he与 make sure之间是主动关系,排除 C;又因 lights与 turn off之间是被动关系,应用被动语态,故答案为 A。 make sure意为 “ 保证,确保 ” ,后面可跟that引导的宾语从句。 • 【 答案 】 A • 3. Her car broke down on her way to the park; ________, she had to ask someone to repair it. • A. sooner or later B. more or less • C. what’ s more D. as a result • 【 解析 】 考查短语辨析。 句意为:她的车在去公园的路上抛锚了,结果,她不得不找人来修。 as a result结果,为最佳选项。 sooner or later迟早; more or less或多或少;差不多; what’ s more更有甚者;均不合题意。 • 【 答案 】 D • 4. He is unable to go to work________the fall off his bike. • A. as a result B. as a result of • C. as the result D. as result of • 【 解析 】 句意为:由于从自行车上摔了下来,他不能去工作了。 as a result of由于 „„ 的缘故,后面接原因;但 as a result之后表明的是结果。 C、 D两项在结构上是错误的,不是正确短语搭配。 • 【 答案 】 B • 5. She was________hungry and she wanted to buy something to eat at once. • A. not a bit B. little • C. not a little D. bit • 【 答案 】 C • 1. She’ s kind and patient, and she explains English grammar ________ ________ ________ even I can understand it! • 她和善且有耐心,语法讲解得如此清晰,甚至连我也能听懂。 • 【 答案 】 so clearly that • 2. Physics will never be my favourite lesson, but I think that I’ ll do well in the exam ________ ________ ________ ________ ______. • 虽然物理永远不会是我最喜欢的课,但是我认为有陈老师教我,我会在考试中取得好成绩。 • 【 答案 】 with Mrs Chen teaching me • 3. ________ ________study history ________ geography because I can learn a lot from many historical 而不愿学地理,因为我可以从许多历史人物中学到许多东西。 • 【 答案 】 I’ d rather; than • 4. I think ________ ________ ________ he really enjoys teaching Chinese literature.我认为这是因为他实际上喜欢教中国文学。 • 【 答案 】 this is because • She’ s kind and patient, and she explains English grammar so clearly that even I can understand it! • 她和善且有耐心,语法讲解得如此清晰,甚至连我也能听懂。 • so...that...如此 „„ 以至于 „„ ;如此 „„ 使得 „„ ,引起结果状语从句,此处 so是副词,口语中可省略 that。 • so...that...句式的常见用法如下: • ① This problem is so difficult that nobody can work it out. • 这道题太难,没有一个人能解出来。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。