传感器新技术的发展外文资料翻译内容摘要:
aft, various guides corrosion and steams plates, the sputtering thin film and so on, these have all introduced to the sensor manufacture. Thus has produced each kind of new sensor, like makes the silicon micro sensor using the semiconductor technology, makes the fast response using the thin film craft the gas to be sensitive, the wet sensitive sensor, the use sputtering thin film craft system pressure transmitter and so on.. The Japanese horizontal river pany uses various guides’ corrosion technology to carry on the high accuracy three dimensional processing。 the system helps the silicon resonance type pressure transmitter. The core partially presses two resonant Liang by the feeling which above the silicon diaphragm and the silicon diaphragm manufactures to form, two resonant Liang39。 s frequency difference correspondence different pressure, measures the pressure with the frequency difference method, may eliminate the error which factor and so on ambient temperature brings. When ambient temperature change, two resonant Liang frequencies and the amplitude variation are same, after two frequency differences, its same change quantity can counterbalance mutually. It’s survey most high accuracy may reach %FS. American Silicon Microstructure Inc.(SMI) the pany develops a series of low ends, linear in % to 65% scope silicon micro pressure transmitter, the lowest full measuring range is (1KPa), it makes take the silicon as the material, has the unique three dimensional structure, the light slight machinefinishing, makes the wheat stone bridge many times with the etching on the silicon diaphragm, when above silicon chip stress, it has the distortion, the resistance produces presses the anti effect but to lose the bridge balance, the output and the pressure bees the proportion the electrical signal. Such silicon micro sensor is the front technology which now the sensor develops, Its essential feature is the sensitive unit volume is a micron magnitude, Is the traditional sensor several dozens, several 1%. In aspect and so on industry control, aerospace domain, biomedicine has the vital role, like on the airplane the use may reduce the airplane weight, reduces the energy. Another characteristic is can be sensitive is small surveyed, may make the blood pressure pressure transmitter. The Chinese aviation main corporation Beijing observation and control technical research institute, the development CYJ series splashes thanks the membrane pressure transmitter is uses the ion sputtering craft to process the metal strain gauge, it has over e the nonmetallic strain gauge easily the temperature influence insufficiency, has the high stability, is suitable in each kind of situation, is measured the medium scope widely, but also overcame the tradition lowly to glue the precision which the type brought, sluggish big, shorting and so on slow change, had the precision high, the reliability is high, the volume small characteristic, widely used in domain and so on avia。传感器新技术的发展外文资料翻译
相关推荐
传。 人物简介 邓小平( 1904~ 1997) 原名邓先圣,学名邓希贤,四川广安人。 伟大的马克思主义者,无产阶级革命家、政治家、军事家、外交家,中国共产党、中国人民解放军、中华人民共和国的主要领导人之一,中国社会主义改革开放和现代化建设的总设计师,建设中国特色社会主义理论(邓小平理论)的创立者。 整体把握邓小平同志 1921— 1923年的 年谱 时间 事件 1921年 4月 23日
1、最新农副产品和食品加工技术鱼肉脱腥与方便食品的制作鱼肉脱腥与方便食品的制作我国渔业资源丰富,但对其精深加工的研究和开发跟不上渔业的发展。 将鱼肉加工成方便即食食品,存在腥味的问题,只有解决了这个问题,才可将其制成即食方便食品。 通过对脱鱼肉腥味进行过研究,现将脱腥方法脱鱼肉方便食品的开发简介如下。 一、脱腥实验l、实验材料:池塘养殖白鲢。 脱腥剂:冷水(15),盐水,化钙溶液,0.3 液,
. 2).比较 以上各值 ,最大的就是函数的最大值 .最小的就是函数的最小值 . 例 1 求函数 在 [3,5]上的最大值与最小值 . 解 : 4431 3 xxy,439。 2 xy求导数 列表 x 3 5 y 39。 y,x 21 得极大值 极小值 2 2 (3,2) (2,2) (2,5) 0 0 + + 7 5 37721 0x 2 4解方程 .34)2(
其总电阻为 Rmax,它的滑臂间的阻值可以用 Rx = _x/Xmax Rmax_(① Xmax/x Rmax,② Xmax/XRmax③ X/XmaxRmax)来计算,其中电阻灵敏 度 Rr=__2p(b+h)/At_(① 2pAt/b+h,② 2A(b+b)/pt, ③ 2Atp(b+h))。 ( 4分) 二、什么是系统误差( 8分)。 产生系统误差的原因是什么( 10 分)。
1、最新农副产品和食品加工技术鱼丸生产工艺流程及操作要点(一)工艺流程和生产设备 原料鱼处理(各种处理机)清洗(洗鱼机)采肉(采肉机)漂洗(水洗机)脱水(离心机或压榨机)精滤(精滤机)绞肉(绞肉机)擂溃(擂溃机)成型(各种成型机)加热凝胶化(自动恒温凝胶化机)冷却(冷却机)包装(真空包装机或自动包装机) (二)操作要点 1、原料选择可用于制作鱼糜的原料品种有 100 余种。 一般选用白色肉鱼类