新人教版英语高二下module7unit2robots之四内容摘要:
can check your . It can help children do research on the Inter for their homework, talk to them about their day at school, play games, and even dance with them. AD: Unbelievable! Now, let’s move on to other types of robots. You also found out about a tiny robot plane, didn’t you? EW: That’s right, Alan. This wonderful little robot weighs less than 9 grams and has a camera. In the near future it’ll be used to fly into dangerous areas and check if anyone is trapped inside. AD: So it could save a lot of people’s lives. EW: Yes, and, recently, a walking chair’s been developed that the makers believe will help people who can’t walk to go up and down stairs. AD: Well, Emma, thanks so much for telling us a little bit about the exciting world of robots. Now what are you going to talk about next week? Reading task Three decades of war in Cambodia have left scars in many forms throughout the country. Unfortunately, one of the most lasting legacies of the conflicts continues to claim new victims daily. Read this piece of news about landmines. In most cases, even the soldiers who planted the mines did not record where they were placed. Now, Cambodia has one of th。新人教版英语高二下module7unit2robots之四
相关推荐
Don’t you think that was a great love story, Kate? K: No, not really. M: You didn’t? Well, I loved it. There was so much emotion between Tony and Claire. K: Molly, that’s rubbish. Tony was just a
t I don’t know if he ______ it. A. wrote。 has finished B. was writing。 has finished C. was writing。 had finished D. wrote。 will finish 2. As she ___ the newspaper, Granny ___ asleep. A. read。 was
l. They have warned us to be careful of rats. 不定式在下列动词后作宾语补足语时,要省略 to “感觉” feel “听” hear, listen to “使役动词” have, make, let “看” see, look at, observe, watch, notice 但当以上的动词用于被动式, to要还原: 1. They saw
rted beating the water with his oar ( ) Clancy jumped into the boat with the whalers. ( ) Clancy arrived at the whaling station ( ) The killers started racing between our boat and the whale ( )
care of. 还有好些事要处理。 I. 根据括号内的提示将下列句子补充完整。 1. He wanted the letter __________ (type) at once. 2. It is the first such project ______________ (design) by Chinese engineers. to be typed to be designed 3.
________written by an old man called Clancy. fleeing dragged depths anecdotes The stories is mainly about Help the whalers Help out man overboard Two stories about Old Tom C D A B Helping the whalers