新人教版英语高二上module6unit4globalwarming之四内容摘要:
Sophie Armstrong wrote the magazine article. The name of the magazine is “Earth care”. are the names of the three scientists mentioned in the article? They are Dr. Janice Foster, Charles Keeling and Gee Hambley. wrote the magazine article? What is the name of the magazine? do they think about global warming? Do they agree with one another? There are some very different attitudes among scientists towards this issue. Some think the effects will be terrible, while some others believe that we should not worry about it. are the two graphs about? Graph 1 shows the temperature increase of one degree Fahrenheit between 1860 to 2020. Graph 2 shows the carbon dioxide content in the atmosphere from 1957 to 1997. Graph 1: Graph 2: is the main topic of the article? Global warming / The warming of the earth. temperature last century didn’t increase much. believes that global warming is caused by the activities of humans. Foster believes that global warming is caused by burning fossil fuels. gas is a greenhouse gas. dioxide is a byproduct of burning fossil fuels. accept Charles Keeling’s data because he took accurate measurements. Read the article carefully. Tell true or false. T T F T T F DetailedReading Read the article in details and finish the following task. listening 1. Who found out the amount of carbon dioxide in the atmosphere from 1957 to 1977? A. Dr. Janice Foster. B。新人教版英语高二上module6unit4globalwarming之四
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。