新人教版英语高二上module5unit1greatscientists之六内容摘要:
as well as at No. 8 and 9 Cambridge Street? John Snow Another Cholera outbreak hit London. These families had not drunk the water from the Broad Street pump. two Steps: What/How? a problem up a question of a method results John Snow Defeats “King Cholera” What causes cholera? Which theory is correct? Gather information when another Cholera hit London in 1854. He marked on a map where all the dead people had lived. 6. Find supporting evidence a conclusion results Looked into the source of the water. Two other deaths. The water is to blame. The source of all drinking water should be examined. Scientific Report by John Snow The problem The cause Idea 1: Idea 2: The method Nobody knew the cause of the serious disease of cholera a strange cloud of gas attacked people. people absorbed the disease with meals gather information from cholera outbreak The results Idea 1 or 2? Why? The conclusion He found the cause of cholera was the polluted water Idea 2. Because the information showed that the dirty water carried cholera He def。新人教版英语高二上module5unit1greatscientists之六
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。