新人教版英语高一下module3unit4astronomythescienceofthestars之一内容摘要:

8 Water appeared on the earth. 9 Shellfish and other fish appeared. 10 The universe began with a “Big Bang”. 11 Clever animals with hands and feet appeared. 12 Mammals appeared. Answer: 10 7 3 8 4 9 6 1 5 2 12 11 Detailed Reading The development of the earth Stage 1: The development of the earth (1) After the Big Bang, what happened? a cloud of dust a violent solid globe exploded with fire and rock produced carbon, nitrogen ,water vapouramp。 gases (2) What happened next? (3) What did the water vapour and gases form? the earth’s atmosphere Water appeared (。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。