仲恺农业工程学院选修课评价20版本内容摘要:

St rict f inancial r ules and r egulat ions, no cr owding and diver sion t o pr event t he violat ion occur red. 2, ar r anging f unds, active, f ul, f ir m t o carr y out prior t o t he const r uct ion of t he wor k. 3, in or der t o ensure t hat XXXXXX r ur al homes f or t he const r uct ion per iod, t he qualit y and t he r ational use of f unds, im plement ation of m ajor heads have overall r esponsibilt y f or t he im plement at ion and m anagement of pr oj ect legal per son r esponsibilt y syst em. 4, str ictly accor ding t o t he r egulations t o im plem ent supervision system of engineer ing const r uct ion pr ojects, hir ing qualif ied super visor y unit s and per sonel, supervision of pr oject const ruction, st rict t im e lim it , qualit y and f unding level. 5, str ict const ruc t ion pr oject plet ion acceptance system and engineering qualit y lif et im e r esponsibilt y syst em of const ruct ion pr oject. Second, t he pr ogress in t he im plem ent at ion of 1, proj ect const r uct ion m anagement of t he pr ogr ess of t he const ruction pr oj ect m ust str ict ly f olow t he capit al constr uction pr ogram. Fr om f easibilt y st udy t o pr oject deliver y, is divided int o f ive phases, t he pr elim inar y wor k phase, design phase, const ruct ion pr epar at ion phase, constr uct ion phase and pr oj ect accept ance phase. The pr oject constr uct ion per iod of 6 m onths, st art ing f rom t he beginning of J une 2020 t o be plet ed in Decem ber 2020, feasibilt y st udies plet ed in ear ly Apr il 2020, end of M ay 2020 constr uct ion design, pr oj ect bidding. From t he beginning of J une 2020 t o st art t he const ruct ion, December 2020 pletion, input f or t hat mont h. Al phases of t he wor k ar e as f olows: ear ly st age pipeline of pr oj ect f easibilt y st udy。 sett ing up a pr oject managem ent。 financing。 select t he survey and design unit s. Designbuilding sit e sur vey and2 分,作业简单,上这课老师送圣经。 英语国家社会与文化入门 18 1 除英语 类专业外 所有年级 教学质量高 点名几率 100% 要学生做 PPT 交论文 老师很恶心 C 插图的文化史 18 1 除艺术类专业外 13 年级 课程有趣 上课随机点名 考试要当堂写论文 A 大学生心理学 27 全校 13 年级 管理心理学 27 全校 13 年级 教学质量高,点名几率 100%,及每节课必抽点名,考试交论文并要求颇多 C 教育学 27 全校 所有年级 老师讲得很好,基本每次课都点名,一开始全点,后来跳着点,中途分组做 ppt 上去讲,最后的作业是一篇论文 A 普通心理学 18 1 全校 13 年级 老师曾经说不来上课也 OK(应该是因为志愿者的原因),考试去考就OK(这次是看电影写感受),考试时间不定 A 社会心理学 18 1 全校 所有年级 国际高等教育概述 18 1 全校 所有年级 点名 考试:交论文 C 大学生学习学 27 全校 所有年级 西方大学发展史概论 18 1 全校 所有年级 朋辈心理咨询理论与技术 18 1 全校 所有年级 点名次数少,不过老师基本上每两节换一次,最后要考试,还要交论文 B 心 理健康教育 18 1 全校 所有年级 不点名 到最后考试是要回答几个问题,每个问题回答 500 字左右, 5个问题 有考试都会过 A 职业生涯规划 18 1 全校 12 年级 老师不时会点名,考试要交个人职规书,课堂感觉还可以。 如果想自学职规,那学这课会起到不错的帮助,如果想从课堂学会职规那就算了吧。 C 大学生创业概论 18 1 全校 23 年级 择业概论 18 1 全校 所有年级 从不点名 考试是写份个人简历 A heat ing, vent ilat ion, and ot her f actor s. Spacing bet ween buildings t o m eet t he specif icat ions r equir ed by incr eases f or gr een buildings, vent ilat ion is good. ( 2) t echnical m easures f or ener gy saving inst r uct ions: 1) r oof: insulat ed r oof . Opt ional over head insulat ion layer of insulat ion or plant ing t he insulat ing layer . 2) Windows: building on each f loor above gr ound 80mm, beam wit h f ul alum inum window, t o light ing, and vent ilat ion. Public locat ion light ing cont r ol using ener gysaving f or buildings t o ext inguish t he swit ch in or der t o achieve energysaving ef f ect . Light ing and lam ps using high ef ficiency ener gy saving f luor escent lam ps, using ener gy saving quick st art ballast s or elect ronic ballast wit h low har m onic cont ent, in or der t o achieve ener gy saving ef fect. 5) use wat er saving equipment and appliances. Using t he closed f lush valve, aut omat ic f aucet s and ener gy saving washing t ank, et c, r educe t he consumpt ion of wat er r esources is invalid, achieve t he pur pose of saving wat er. 6) wat er r ecovery and r euse. 7) seepage, leakagepr oof measures of wat er supply syst em. Accessor ies such as t he wat er supply wor k f or sanit ation, m ust confor m t o t he st andards, im pr ove dur abilt y, prevents leaks, t o achieve t he wat er saving eff ect . Unit 3, energy m anagement ener gy managem ent syst ems and inst it utions, str engt hen t he m anagement of wat er , elect ricit y, and clear m anagem ent r esponsibilt y f or pr event ing r unning, r unning, dr ip, leak, im proved ener gysaving ef f ect . The seventh chapter , envir onmental pr ot ect ion, const ruction sit e envir onment t his proj ect is locat ed in XXXXXX, a beautif ul nat ur al envir onment, and no polut ing ent erpr ises, envir onmental air qualit y good, suit able f or constr uction pr oj ect s. I I, and pr epared according t o 1, and People39。 s Republic of China envir onm ental pr ot ect ion m ethod 2, and const ruct ion pr oj ect envir onmental pr ot ect ion M anagement Or dinance ( St at e [ 1998] 253,) 3, and const ruction pr oj ect envir onmental pr ot ect ion design pr ovides ( count r y m et er wor d [ 1986] 002, ) 4, and on f urt her do const ruction pr oj ect envir onm ental pr ot ect ion m anagement of point s views ( count r y r ing [ 1993] 015, ) 5, and envir onm ent air qualit y st andar d ( GB3095 1996) I I level 6, and sur f ace wat er envir onm ent qualit y st andar d ( GHZB1 1999) c class 7, t he envir onm ent al noise of ur ban ar ea s t andar d ( GB3096 93) t wo class 8, of int egr at ed wast ewat er dischar ge st andar d ( GB8987 1996) class 9, t hr ee of t he const r uct ion noise ( 12523 1990) f olow t he st r at egy of sust ainable developm ent , envir onm ent al pr ot ect ion goals, and ef f ect ively saf eguar d t he r at ional developm ent and ut ilzat ion of r esour。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。