牛津译林版高中英语必修五unit3scienceandnatureperiod1教学课件内容摘要:
f u l h u m an e m b r y o c lo n in g h as c au s e d m u c h d e b at e b e c au s e . A . p e op le s t il l h ave n o c le ar id e a ab ou t t h e r e s u lt s o f h u m an c lo n in g B . val u a b le t is s u e s an d or gan s c an b e u s e d t o s ave h u m an s C . m an k in d is goi n g t o p r od u c e t e r r ib le m on s t e r s 2 . T h e s u c c e s s of t h e c lon e d s h e e p D oll y h as p r ove d t h at . A . c lon in g w il l c r e at e m or e d is e as e s in t h e an im a l wo r ld B . c lon e d an i m als w il l d ie a t a m u c h y ou n ge r age t h an n or m al C . m an h as b e e n ab le t o p r od u c e an e xac t c op y f r om an ad u lt c e ll 3 . A c c or d in g t o t h e p as s age , w h at is t h e r e al in t e n t ion o f I an W il m u t 39。 s c lon in g r e s e ar c h ? A . T o c r e at e c op ie s of h u m an s in t h e e n d . B . T o d e s t r o y h u m an e m b r y os in t h e e n d . C . T o c u r e d e ad ly d is e as e s e ve n t u all y . 4 . How d oe s a w om an w h o c an n ot give a b ir t h b e n e f i t f r om c lon in g? A . S h e c an h ave a b ab y b y u s i n g an ot h e r w om an 39。 s e gg. B . S h e c an h ave a c lon e d b ab y . C . S h e c an ad op t s om e on e e ls e 39。 s c h il d b y c lon in g. 5 . Wh at c an w e in f e r f r om t h e w h ole p as s age ? A . C lon in g an i m als is il le gal i n I t al y . B . C h in e s e s c ie n t is t s a r e t r y in g t o b e n e f it m an k in d b y u s in g c lon in g t e c h n ology . C . C h in e s e s c ie n t is t s w an t t o b e t h e f ir s t t o c lon e a h u m an b ab y . 【答案】 1 - 5 A C C B B Ⅲ .课文缩写 用所给单词的适当形式填空,完成课文缩写 again s t ; a n n ou n c e ; an xie t y ; b e n e f it ; c lo n e ; c on s e q u e n c e ;d is agr e e ; e f。牛津译林版高中英语必修五unit3scienceandnatureperiod1教学课件
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。