英文_布勒机械施工组织设计五冶金建(编辑修改稿)内容摘要:

di ti o ns between P arty A and P arty B Des i gn handov er Des i gn er an d P arty A work wi t h P arty B 10 Co ns tr uc ti o n or ga ni z a ti o n des i gn P rep are d by P arty A re g ardi n g t o proj ec t features 7 A gre e me nt of pr e ma d e s truc tural members Ha n dl ed 2 m o nt hs i n a dv a nc e as p er s heet of prel i mi nary es ti mati on P l an of materi al s uppl y P rep are d as p er c o ns tr uc ti o n s c hedul e and pl anni ng S i te arrangemen t A rrangement as per general s c hedul e 2 W ork managem en t M an a ge m en t ac c ordi n g t o proj ec t s c hedul e 5 Start appl i c ati on report Handl ed after c ontrac t s i gnature S i te l ofti ng A s per d es i g n dr a wi n g a n d s ta n dar d c ol l ec ti on of approv ed drawi ngs Ins pec ti on o f meas ureme nt equi pments A s req ui re d by mu ni c i pal m eas uri n g authori ty Ins t al l ati o n amp。 tri al runni ng of motor E ns ur e no ac c i d en t duri n g c on ti n uo us operati on M at eri al tes t , d es i g n tes t for pr op orti oni ng ra ti o o f c onc rete and mortar S a mpl ed by W ux i l ab or at ory wi th fi rs t qu al i fi c ati o n l ev el th at s h al l pr ov i d e c orrec t proporti oni ng rati o Annex: Plan of project start/ pletion and exit Work Description Days from defined handover date Remark Check contracted works According to design drawing s and contract 20 Completion Final work, missing works and repair Draft operation plan and operate works simultaneously 20 acceptance Completion acceptance documents Classify collected and kept documents and files 20 Selfcheck by all construction units According to related rules, assessment standards and contract provisions 15 Preparation Selfcheck anized by project manager Organize operation, technical, quality and preliminary estimation departments 20 Fill the notice for pletion acceptance After selfcheck confirms pliance with requirements and standards 20 Job Preliminary check by pany Supervision personnel anizes operation, technical, quality and preliminary estimation departments 15 Submit acceptance application report Submitted by pany to supervision unit 15 Party A: site acceptance Conducted by acceptance team under anization of supervision personnel 10 Party B: official acceptance Owner, designer, construction personnel, and quality supervision station participate in the acceptance under guidance of supervision engineers 10 Completion 1. Visual check As per related rules, assessment standards, contract requirements, design drawings 10 2. Measurement check As per related rules, assessment standards, contract requirements, design drawings 10 3. Document check Check if the listed are plete 10 4. Site acceptance conference 1) Project manager introduces selfcheck and pletion of project 10 Acceptance 2) Present pletion documents including pletion drawings and original documents and records 10 3) Supervision engineers notify main contents during supervision and give ments of pletion acceptance. 10 4) Owner requires construction unit to treat any problem found in the pletion acceptance within limited schedule. 10 5) QC department with owner and supervision engineers discuss whether project passes official acceptance on the preliminary meeting 10 6) On the review meeting supervision engineers release acceptance results and QC personnel gives quality rating of project 5 Party C: Acquire pletion acceptance certificate Certificate is valid only with signatures of legally authorized representatives 5 Handover Exit works Quickly remove rest construction materials, turnover materials, tools and temporary facilities 5 Repair works Road, curb and greening 5 Cleaning works Conduct one thorough cleaning work to keep orderly and clean 3 Official handover Hold handover ceremony 1 Annex 1: Plan and allocation of labor No. Phase Preparation Civil engineering construction Outdoor road pavement Outdoor ground construction Final works Works Population Population Population Population Population 1 Bricker layer 15 20 30 40 10 2 Woodworker 10 15 20 5 2 3 Steelbar worker 8 15 15 3 2 4 Scaffolder / 4 6 2 12 5 Electrical welder 2 2 4 4 1 6 Electrician 2 3 4 4 1 7 Piping worker 6 2 10 5 1 8 Painter 3 / 3 1 9 Auxiliary worker 3 5 5 5 2 Totaled in 49 66 94 71 32 Annex 2: List of main machines for roadamp。 ground works No Equipment Unit Qty. Application Remark 1 Excavator Set 1 Excavate earth 2 Bulldozer Set 1 Level the ground 3 Road roller Set 2 Compact the ground 15T, 25T 4 Concrete mixer Set 1 Concreting 5 Vacuum waterabsorption pump Set 1 Absorb water on the surface 6 Concrete finisher Set 1 Finish concrete layer 7 Frog rammer Set 2 Compact the floor 8 Generator Set 1 Temporary power supply 70KW 9 Wholestation instrument Set 1 Measurement Annex 3: List of main machines expected for civil construction No. Equipment Spec. Qty. Original place Manufacture year Rated power KW Productivity Application post Remark 1 AC electricwelding machine BXT400 1 Jianhu 20xx 21 Welding 2 DC electricwelding machine AX4300 1 Yangzhou 20xx 30 Welding 3 Disk saw YPJ2 1 Wuxi 20xx Wood processing 4 Manual electrical saw 1 Wuxi Purchased later Wood processing 5 Concrete rammer JZM350 1 Yangzhou 20xx Make mortar and partial concrete 6 Mortar mixer HJ200A 1 Yangzhou Purchased later Make mortar 7 Plate vibrator ZW5 1 Shanghai Purchased later Concreting 8 Vibration rod ZP。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。