外研版高中英语必修5module2ajobworthdoin5内容摘要:

board. 3. Can the bus driver see the lorry? 4. Can the lorry driver see the bus? No. No. 1. A nearly vertical fall 2. A form of transport, especially one with an engine and four wheels •Find the words or phrases in the passage which mean: sheer drop vehicle 3. To still be alive, after being in an accident 4. The total number of dead ( an accident) survive death toll 5. A part of the road which is not straight 6. To be used to something that you don’t see its true value and don’t show t。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。