20xx人教版新起点英语六上unit4feelingslesson2课件内容摘要:

You look sad in this picture. Why? Bill: I was sad because I was ill. I had to stay Lily: Well, look at this picture. You’re in bed, too, but you look happy. Why? Bill: I was happy because Andy came to see me and helped me with my maths. in bed. Presentation  Listen and repeat. Bill: I was worried because I wasn’t good at maths. Lily: Oh, you look worried in this picture. What happed? I did。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。