高考定语从句中关系代词的选择内容摘要:
A. that B. which C. where D. what 【 解析 】 从表面看,大家很容易选 B,而忽略插入语 you know在句中不充当句子成分,从句谓语动词是 work, 不及物动词,故应用关系副词而不用关系代词 which, that, 所以选 C。 2. 有些表示时间、地点或原因的名词作先行词时,定语从句可用关系代词或关系副词引导,关键要看从句谓语动词是及物还是不及物动词。 是及物动词,则用关系代词,反之则用关系副词。 【 真题赏析 1】 Anyway, that evening, ____ I’ll tell you more about later, I ended up staying at Rachel’s place. ( 2020浙江) A. when B. where C. what D. which 【 解析 】 真题 1先行词是 evening, 大家很容易选 A,从句部分缺少介词 about的宾语,故选 D 【 真题赏析 2】 Is this the reason ________ at the meeting for his carelessness in his work? (2020上海春招 ) A. he explained B. what he explained C. how he explained D. why he explained 【 解析 】 真题 2先行词是 reason, 大家容易选D,而忽略定语从句中的谓语动词 explain是及物动词,须跟宾语, B、 C两项中的 how, what不能引导定语从句,故选 A,在此省略了关系代词 which或 that. 3. 有些名词具有多重含义,如: lawyer, teacher, doctor等,可以表示某人,也可以表示某种职业,作先行词时,关系代词就有变化。 【 真题赏析 】 Her sister has bee a lawyer, ___________she wanted to be. ( 2020湖北) A. who B. that C. w。高考定语从句中关系代词的选择
相关推荐
步 ) 1 在低倍镜下找到物象,将物象移至( ), 2 转动( ),换上高倍镜。 3 调节( )和( ),使视野亮度适宜。 4 调节( ),使物象清晰。 二、显微镜使用常识 1调亮视野的两种方法 ( )、( )。 2高倍镜:物象( ),视野( ),看到细胞数目( )。 低倍镜:物象( ),视野( ),看到的细胞数( )。 视野中央 转换器 光圈 反光镜 细准焦螺旋 放大光圈 使用凹面镜 大 暗
1、汽车行业研究报告国信证券 20023:21一、 行业概况 近年来,我国汽车工业得到了较快发展,形成了比较完整的汽车产品系列和生产布局,国产汽车市场占有率超过 95%,载货汽车品种和产量基本满足国内市场需求,轿车市场供需矛盾突出的问题得到了缓解。 我国已成为世界摩托车生产大国,形成了几家初具国际竞争规模的摩托车生产企业,品种和数量基本满足国内市场需求并有部分进入国际市场。 1 、 企业分布。
He was tired, so he went to bed. 1. He was tired. He went to bed. 2. The child hid behind his mother39。 s skirt. He was afraid of the dog. 3. He made a promise. He didn’t keep it. He made a promise,
级有关职能部门的正确领导下 ,通过 公司全体干部、职工的共同努力取得了一定的成绩,现将 2020 年度工作总结如下: 一、紧紧围绕中心工 作 ,快速推进在建工程 2020 年我市交通工作总的指导思想是:以党的十七大及十七届三中全会精神为指导,深入实践科学发展观,牢牢把握国家、省、市扩大内需政策措施,面对全球金融风暴的形势,我们将坚定信心,抢抓机遇,应对挑战,负重推进交通基础设施建设