北师大版英语高二下册unit22environmentalprotection之一内容摘要:
ist _____________ global warming at least three times in his speech. 6) The factory was producing greenhouse gases _________________ . beyond our control As a result of referred to in huge quantities Part VI Grammar Reporting 1. What verbs are used in the text to report these statements? Example 1) = to report that 1) Human beings are causing changes in the Earth’s climate. 2) Gases pumped into the Earth’s atmosphere have been speeding up the process of global warming. to report that to claim that 3) Global warming could be one of the biggest environmental problems facing the 21st century. 4) Global warming is mostly due to human activities. 5) Global warming will cause dramatic climate changes including more frequent floods, heat waves, and droughts. to believe that to insist that to warn that 2. Look at these sentences from the text and explain why the underlined verbs are not the same tense as the reporting verbs. 1) Recent reports from the IPCC warned that global warming will cause dramatic climate changes. 2) Scientists found that the temperature of the Earth is controlled by greenhouse gases. because it is in the future because it is a general truth 转述结构 在转述他人的话、观点或看法时,常常使用转述结构,转述结构也叫间接引语。 在转述别人的话时,需要注意以下几方面: 一、句子结构的变化 1) 如果转述的话是陈述句,转述结构一般由转述动词 + (sb +) that从句构成。 如: He said, ―I’ll give you an examination next Monday.‖ → He told us that he would give us an examination the next Monday. 此外类似的转述动词还有: repeat, admit, whisper, answer, reply, explain, announce, declare, think等,又如: He explained to us that he was late because of the heavy traffic. The judge declared that they were innocent and should be set free right away. 2) 如果转述的话为一般疑问句,转述时要用连词 whether或 if引导。 这样的转述动词主要有 ask, wonder, inquire等。 如: He said, ―Do you have any difficulty with pronunciation?‖ → He asked (me) whether/ if I had any difficulty with my pronunciation. 3) 转述的话为祈使句时,转述时要用带 to的不定式表达,这样的转述动词有: ask, advise, tell, warn, order, request等。 如: “ Never e here again!‖ said the officer nearby. → The officer nearby ordered them never to go there again. 4)当转述的话形式上是疑问句,有表示“请求,建议”意义时,可用 ask sb to do sth /suggest doing/advise sb to do sth 等形式转述。 如: “ Would you mind opening the door?‖ he asked. → ―Why not going out for a walk?‖ he asked us. → He asked me to open the door. He advised us to go out for a walk. He suggested going out for a walk. 二、时态的变化 1) 如果转述内容是以宾语从句的形式出现,则应注意正确使用宾语从句中的时态,注意保持从句和主语谓语动词在时态方面的一致性。 主句中的谓语动词如果是过去时,从句(即转述部分)的谓语动词在时态方面要作相应的变化,变成过去时范畴的各种时态(实际也是宾语从句的时态要求),如: He told me that he would take two days off work. The boy admitted that he had made a mistake. 2) 直接引语变成间接引语时,从句时态无须改变的情况 : (1) 当主句的谓语动词是一般现在时的时候,如: He always says, ―I am tired out.‖ → (2)当直接引语部分带有具体的过去时间状语时,如: He said, ―I went to college in 1994.‖ → He always says that he is tired out. He told us that he went to college in 1994. (3) 当直接引语是客观真理或自然现象时,如: Our teacher said to us, ―Light travels faster than sound.‖ → (4)当引语是谚语、格言时,如: He said, ―Practice makes perfect.‖ → Our teacher told us that light travels faster than sound. He said that practice makes perfect. (5) 当直接引语中有情态动词 should, would, could, had better等时, 如: The doctor said, ―You’d better drink plenty of water.‖ → The doctor said I’d better drink plenty of water. 另外注意: 转述中的变化要因实际情况而定,不能机械照搬。 如果转述的时间没有发生多大的改变或所转述的内容是一个事实时,宾语从句中的谓语动词所用的时态不必改变。 例如: (1) He says that he is leaving tomorrow. (2) Our teacher told us that the sports meet will take place next Monday. 3. Match the sentences with appropriate reporting verbs from the list. Then write the reported sentences. admit,。北师大版英语高二下册unit22environmentalprotection之一
相关推荐
出现向导选择【 DNS 服务器”】点击【下一步】 点击【下一步】 放入操作系统安装光盘,点击【确定”】继续 点击【下一步】 系统配置完成 出现【新建区域向导”】点击【下一步】 点击【创建正向和反向查找区域(适合大型网络使用)】 选择“辅助区域”,点击【下一步】 【创建正向查找 区域向导】 输入【区域名称”】点击【下一步】 输入主 DNS 服务器地址,点击【下一步】
ame story Complete the passage with these phrasal verbs, exercise 5 Read the passage in Exercise 5 and fill in the blanks with the phrasal verbs. e across hold up grow up stand for count on figure
s have taken place in China in the last thirty years. 5. more than I have more than(over) $100. There are more than 40 students in our class. He is more happy than sad. We are more than tired . The
1、内部控制流程手册(财务管理版) 流程编号: 2002效日期 修改版本 编制人:资金管理流程- 支票管理失效序号 批准人:序号 用范围 本流程适用于公司对支票保管和使用管理。 制目的 对支票的保管和使用进行规范和健全以保证支票保管和使用的安全性、完整性。 行部门 全性 全性 对未使用的空白支票和作废支票进行定期盘点和不定期的抽盘,保证支票使用的安全性和完整性。
llowing is talked in the text. Read and find out the examples of words Helen learned. water。 doll。 think。 love Whilereading • What’s the difference among the four words “water。 doll。 think。 love”
1、制度编号: 9务管理版)版本号: 2002:信息系统管理制度失效序号 批准人:序号 日期信息系统管理制度一、 总则1、公司电脑系统的运行维护和系统管理由微机室电脑人员负责,微机室主任作为系统管理员管理公司内部网络系统及超级密码;2、微机室电脑人员具体负责公司电脑系统的用户管理、系统软硬件日常维护和维修以及向系统使用者提供日常的技术支持等事宜;3