北师大版英语高一上册module2unit6designlesson2内容摘要:
. What kind of building does the man mention? A. palace B. bank C. skyscraper D. castle 2. In which period was the building built? A. modern B. medieval C. 1930s D. early twentieth century 3. What kind of material(s) was the building made of? A. concrete, metal and glass B. stone C. tiles D. marble 4. What features does the building have? A. balcony and statues B. tower and thick walls C. metal roof D. ornaments Section2 Listen to section 3 and plete the table with the time you hear. events built in destroyed in in ruins for rebuilt in Time the 13th century 1719 200 years 1932 Section3 Listen to section 4 and fill in the blank with the words you hear. The Chrysler Building in New York is not the _______ skyscraper in New York, but it is one of the most beautiful. This skyscraper was made of new ___。北师大版英语高一上册module2unit6designlesson2
相关推荐
4. What did you do before get on the plane? 5. What happened or what did you do during the flight? 6. How did you like traveling by plane? Listen to the Broadcast and take notes while listening.
the beach Horseriding Skim and answer: • ’s the name of the radio show? • is the birthplace of Fiona? • is the weather in Australia? • Country of the world Australia So good Read again and do
f humour have not been scientifically examined. 2. Dr Fry believes that laughter associated with happiness involves the whole body. 3. It wouldn’t be beneficial if humour got rid of all the stress
1、三、发现事项及建议12我们根据二二年六月十日至二二年六月二十八日在公司进行诊断工作中的对各主要业务循环中发现的问题以及我们的建议详细说明如下:1、预算管理 132、销售流程管理3、存货采购流程管理4、存货管理5、固定资产及在建工程管理6、现金管理7、人力资源管理8、会计记录与核算9、信息系统管理三、发现事项及建议131、算管理组织架构 算编制与调整 预算方案审批 算执行与考核三
y life, such as vegetables, flowers, birds and insects. is more good at drawing simple pictures we often see in our life? (18641957) one of the top artists of the present age Qi Baishi is famous for
生,为艺 何谓坚持。 在饥饿表演期间是绝对不吃东西的,即使有人强迫他吃,他也会无动于衷。 他的艺术的荣誉不允许他这么做。 为什么刚到四十天就停止表演呢。 他本来能长期地、无休止地饿下去,为什么恰恰要在他表演最紧要的关头停下来呢。 他还没有真正精彩地表演过一回哩。 可是人们为什么要夺走他继续挨饿的荣誉呢。 为什么这些对他佩服得五体投地的人多一点耐心都没有呢。 饥饿艺术家的坚持 —“我只能挨饿