高二选修7unit2robots-reading内容摘要:

ushed him away and ran to her room for the rest of the day. Then she rememberedTony was just a machine. She shouted “Leave me alone” and ran to her bed. did Claire feel alarmed at the sight of Tony? A. Because he was a robot. B. Because she didn’t like him. C. Because he was more like a being than a machine. D. Because he never changed his facial expressions. 7. We can infer that when Claire first saw Tony, she felt alarmed by _____. A. his appearance B. his ability C. his facial expressions D. his cleverness A 8. Why did Claire buy the items from the shop? A. Because her husband was to return. B. Because Tony was to leave. C. Because Tony wanted the house transformed. D. Because she thought she needed them. C robot Tony helped Claire to realize her dream by______. A. making her home elegant B. giving her a new haircut and changing the makeup she wore C. giving her advice on her dresses D. all the above 10. Which of the following is NOT the reason why Tony opened the curtains? A. To let other women see everything. B. To show the risk of Claire’s marriage. C. To let other women envy Claire. D. To make Claire elegant just like her neighbor. B 11. As a result, the experiment shows _____. A. Claire and Tony fell in love with each other B. Tony had to be rebuilt C. Tony was angry with his designer D. Both A and B 12. All the following statements are true except _____. A. Tony tried to please Clai。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。