牛津译林版高中英语选修七unit1livingwithtechnologygrammar课件内容摘要:
ople had to leave their homes. More challenges lie ahead of me. Intransitive verbs can usually be followed by an adverbial. • Bored with life in the city, he moved to a remote village accessible only by boat. • Some intransitive verbs can be followed by a prepositional phrase. • Mum is cooking (breakfast) in the kitchen now. • To everyone’s surprise, he contributed $5,000 to a local charity. • Many different people contributed to the development of TV. • Many verbs can be both transitive and intransitive. Practice P9 A • 1. checked (vt.) • 2. bought (vt.) • 3. sitting (vi.) • 4. see (vt.) • 5. talked (vi.) • 6. turned (vi.) • 7. hurts (vi.) • 8. eat (vt.) • 9. thought (vt.) • 10. smiled (vi.) P9 B 1. a. answer b. answer for 2. a. fail (in) b. fail 3. a. suffering b. suffered from 4. a. allow。牛津译林版高中英语选修七unit1livingwithtechnologygrammar课件
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。