高二英语lesson42thehurricane(nx)内容摘要:
rricane happening damage repaired the reasons why trees were pushed over very easily examples of lucky escapes Main idea of each paragraph Retell the passage with the help of pictures and key words given. Retelling : hurricane, struck, England Scotland, England ground, wet, leaves on Trees, electricity lines, telephone poles, bring down water supply, cut off clean roads, army called in workers, help repair, damage List the things we could do before and after a hurricane? Discussion : Build strong houses Live in the houses with tall trees around Bury the lines underground Forecast (预报 ) the weather accurately Prepare some clothes, raincoats, sleeping bags, a flashlight, bottles of drinking water, and canned food.。高二英语lesson42thehurricane(nx)
相关推荐
例如: The house is to let. I felt l was to blame. NOTICE 动词不定式主动语态形式的使用要比被动语态形式的使用普遍,有时(尤其在口语中)虽然意思上是被动的,也往往用主动语态形式来表示。 I have three motors to repair today. The task is difficult to finish on time. 1.
摄像机已经发展到了 200 万、 500 万甚至 1600 万像素的超高清阶段,另外,无线 IP 摄像机的应用更使施工安装获得了极大的便捷性,节省传统安防监控所需的繁复布线施工成本。 总之, IP 摄像机的应用为用户真正实现了任何时间任何地点联网监控的目的。 DLink 安防监控 IP 摄像机产品线目前分为商业应用和专业应用两个系列。 商业应用系列用以 满足家庭、 SOHO 办公、
____。 A. provides B. offers C. supplies D. volunteers 答案: D 本题题意:现在背诵上周学的那首诗。 谁自告奋勇。 volunteer表示 “ 自愿 (做 )”。 (2)If you wish to join our mittee and________for the betterment of the whole school,
• 结论 : E=BLv1=BLvsinθ • 在国际单位制中,上式中 B、 L、 v的单位分别是特斯拉( T)、米( m)、米每秒( m/s), θ指 v与 B的夹角。 • 【 例 1】 如图所示,有一弯成 θ角的光滑金属导轨 POQ,水平放置在磁感应强度为 B的匀强磁场中,磁场方向与导轨平面垂直,有一金属棒 MN
而引起的恐惧 ,又指来自内心的害怕与焦虑。 We were fearful of losing our way in the forest. 我们担心在森林里迷路。 (4)terrible侧重指给人以长久的惊骇 , 极端的恐怖 , 令人难以忍受。 The flood last year was a terrible catastrophe in which many people died.