北师大版高中英语必修2unit6designsectionⅲ课件内容摘要:

o from the passage? 我们从文章中可以得出什么结论。 ② _________________, I’d like to say how much I have enjoyed myself ,我想说我今天玩得很开心。 ③ Don’ t jump to a conclusion before considering all the 有考虑所有事实之前,不要匆忙下结论。 ④ _____________, the plan wasn’ t practical at all. 总之,这份计划一点也不实用。 ⑤ We ______________what he said that he wouldn’ t support us. 我们从他说的话中得出结论:他不会支持我们的。 ⑥ I would like to conclude with a few points. 我想用几点来做个结论。 In conclusion To conclude concluded from 【 活用 】 —— 用 conclude的相关词语完成小片段 Jack said he could(1)____________(从 „„ 中得出结论 )Jane’s expression that Jane had stolen his everyone knew Jack always (2)______________________(匆忙下结论 )without any evidence to support his (3)____________(结论 ).(4)____________(最后 ), nobody was likely to believe Jane was a thief. conclude from jumped to conclusions conclusion In conclusion 6. too much 太多 (教材 P42). ..be careful not to make too much noise, and worried about the landlord being angry. „„ 不用小心翼翼地避免大声喧哗 , 也不用担心房东生气。 too much的用法: (1)用作名词词组 (2)用作形容词词组 , 修饰不可数名词 (3)用作副词词组 , 修饰不及物动词 ① They failed to reach a settlement, because they disagreed too much with each other. 他们没能达成协议 , 因为他们相互之间不一致的太多。 ② Don’ t spend _________________in dressing yourself. 不要花太多的时间打扮。 ③ My parents never interfere with my plan too much. 我父母从不太多干涉我想干的事情。 too much time [易混辨析 ]too much, much too 【 活用 】 —— 用上述短语完成小片段 There is (1)___________ work for the young felt (2)___________ disappointed and regretted not asking for a leave. too much 意为 “ 太多 ” , 可以单独使用也可以修饰不可数名词或动词。 much too 意思是 “ 太 ” , 通常修饰形容词和副词 , 不能修饰动词。 too much much too 7. at least 至少;起码 (教材 P42)And we’d have a basement and at least three washrooms so when we wanted to bathe we wouldn’t have to tell everybody. 并且我们会有一个地下室以及至少三个卫生间 , 这样我们想洗澡时就不用通知任何人。 (1)not in the least(= not at all/not a bit) 一点也不 last but not least 最后但并非不重要的 (一点 ) (2)反义短语: at(the)most 至多 , 顶多 ① At least, he was still able to take photographs of the underwater。 ② I’ m _________________satisfied with the result. 我对这结果一点也不满意。 ③ Last but not least, I must thank our host for his hospitality.最后但并非不重要的一点,我得感谢我们主人的热情好客。 ④ He has finished half of the project _________by now. 到现在为止,他至多完成了规划的一半。 not in the least at most 8. dream of 梦想 , 渴望 (教材 P42)This was the house Papa talked about when he dreamed of being rich and this was the house Mama dreamed up in the stories she told us before we went to bed. 这是爸爸梦想富有时所讲述的房子 , 也是在睡觉前妈妈给我们讲的故事中她所梦想的房子。 dream about= dream of 梦想 , 后跟名词 /代词 /动名词 dream up 虚构;凭空想象 dream a. ..dream 做一个 „„ 梦 ① Which boy hasn’ t dreamed of being a cool secret agent (特工 )? 哪一个男孩不梦想成为一个很酷的秘密特工呢。 ② We used to dream about living abroad. 过去我们常常梦想去国外生活。 ③ It’ s strange that you ___________a novel idea like this. 真奇怪你竟能想出这么新奇的主意来。 dream up 9. hold one’s breath 屏住呼吸 (教材 P42)It’s small and red with narrow steps in front and windows so small that you’d think they were holding their breath. 房子很小 , 还是红色的 , 前面有狭窄的台阶 , 窗户小得让你觉得它们在屏住呼吸。 take a deep breath 深吸一口气 lose one’ s breath 喘不过气来 out of breath 上气不接下气 under one’ s breath 小声地 , 轻声地 (说 ) ① It’ s possible to hold one’s breath for three minutes, with ,屏住呼吸三分钟是可能的。 ② If you don’ t mind, I’ ll stop and ______。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。