unitoneandtwo内容摘要:

is ____ after the heavy rain. • The next morning I was the first to _____. • We must do everything we can to ____ the people’s living standard. Anyone/any one, everyone/every one • ____ of us has the right to be educated. • ____ of the books here is worth reading. • Does____ want to see the film? • I never talk about any of the things with ____. Almost/ nearly • The chairman said _____ nothing at the meeting. • There are not ____ enough people here to do it. • It ____ two weeks to get there. • The money is not ____ enough for m。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。