高一下学期unit16scientistsatwork内容摘要:
• 3. Franklin made the kite of silk because wet silk does not conduct electricity. • 4. A condenser was used in the experiment to store electricity. • 5. The key tied to the string was put into the door to stop the kite from flying away. (T) (F) (F) (T) (F) Answer the following questions did Benjamin Franklin do this experiment with the kite? He wanted to prove that lightning and electricity are the same thing. A silk kite will last longer in bad。高一下学期unit16scientistsatwork
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。