新人教版英语高一上module1unit2englisharoundtheworld内容摘要:

of each paragraph people all over the world speak English. speakers can understand each other even if they don39。 t speak the same kind of English. reason why English has changed over time. by the 19th century the language was settled. is now spoken wide in South Asia. Read the passage again and then make a timeline of the development of English The timeline of the development of English The timeline of the development of English AD 4501150 AD 8001150 In the 1600s In 1620 In the 18th century 17651947 By the 19th century The timeline of the development of English AD 4501150 the English was spoken in was based more on German than the English we speak at present. AD 8001150 In the 1600s In 1620 In the 18th century 17651947 By the 19th century The timeline of the development of English AD 4501150 the English was spoken in was based more on German than the English we speak at present. AD 8001150 Because the people who ruled England spoke first Danish and later French. English became less like German In the 1600s In 1620 In the 18th century 17651947 By the 19th century The timeline of the development of English AD 4501150 the English was spoken in was based more on German than the English we speak at present. AD 8001150 Because the people who r。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。