外研版高中英语必修4module2trafficjpt复习课件内容摘要:

Keeping away from troublesome traffic jams on the way to work is a dream for many people in busy cities, but David Grimes in Britain made that dream 1 true. He 2 to work。 The 37yearold IT manager puts on a swimming suit each morning and kitesurfs to his office in Brighton. He lives in a beach house along the 3 , and the trip to the shore nearest his office 4 about 30 minutes. He then 5 up his equipment, walks the short 6 to his office and changes, James Bondstyle, 7 a shirt and jacket, ready for work。 Mr. Grimes said, “It’s so much 8 than sitting in the car—it is good exercise and environmentally 9 . I usually sail about 20 miles an hour, 10 is better than cars do along the coast road. I kitesurf most days and when the wind isn’t 11 enough I get my bike out and 12 to work. I check the 13 each morning only by putting my head out of a window at my home. It’s quite easy really. ” Prevailing southwesterly winds 14 the return trip home would take two hours, so Mr. Grimes carries his foldedup 15 and jumps onto a bus at the end of each day. Mr. Grimes has been riding the 16 to work for 4 years and believes he’s the only kitesurfing worker in Britain. He said his mode of transport 17 the car by five to ten minutes, 18 he’s not doing it just to save time. Mr. Grimes said, “I’m 19 for permission for a wind turbine at my home and I’m planning to set up heating 20 use of sunshine. ” 【 文章大意 】 本文主要讲了英国住在海滨的 David Grimes为了避开交通堵塞 , 用风筝冲浪去上班的情况。 1. A. e B. go C. fall D. keep 【 解析 】 选 A。 e true(梦想 )实现。 2. A. drives B. flies C. surfs D. walks 【 解析 】 选 C。 根据第二段的 kitesurfs to his office以及下文的内容可知他是利用风筝冲浪去上班。 3. A. river B. plain C. lake D. coast 【 解析 】 选 D。 根据这一句中的 beach(海滩 )以及第三段的 I usually sail about 20 miles an hour, 10 is better than cars do along the coast road. 可知选 D。 4. A. spends B. takes C. pays D. costs 【 解析 】 选 B。 take表示 “ 花费时间 ” 时 , 其主语常是事情等。 cost表示 “ 花费金钱 ” 时 , 其主语常是事情等。 spend与 pay的主语是人。 5. A. puts B. picks C. sets D. gathers 【 解析 】 选 D。 put up举起 , 张贴 , 搭建。 pick up拾起 , 收听 , 接人。 set up建立。 gather up收集起。 此处指收拾起他的工具。 6. A. destination B. distance C. direction D. desert 【 解析 】 选 B。 walk the short distance走近路。 7. A. into B. with C. at D. on 【 解析 】 选 A。 此处考查 change into(把衣服换成 )。 8. A. better B. worse C. good D. bad 【 解析 】 选 A。 根据后面的 than可知此处考查比较级。 又根据下文可知他认为利用风筝冲浪去上班比开车上班更好 , 所以选 A。 9. A. conveniently B. greatly C. friendly D. orderly 【 解析 】 选 C。 environmentally friendly环保的。 10. A. that B. who C. which D. as 【 解析 】 选 C。 考查非限制性定语从句。 此处 which指前面的I usually sail about 20 miles an hour这句话的内容 , 且 which在从句中作主语。 that不能引导非限制性定语从句。 who指人 , 不指物。 as表示 “ 正如 , 正像 ” , 虽然可以指代前面句子的内容 , 但在此处意思不通。 11. A. weak B. strong C. little D. large 【 解析 】 选 B。 此处指风不大时 , 他就骑自行车。 形容 “ 风大 ” , 要用 strong不用 large。 12. A. drive B. walk C. run D. cycle 【 解析 】 选 D。 cycle骑 (自行车 )。 13. A. wind B. rain C. temperature D. water 【 解析 】 选 A。 根据上下文可知他检测的是风的情况。 14. A. intend B. tell C. mean D. decide 【 解析 】 选 C。 此处指 Prevailing southwesterly winds这样的风意味着他回家时要用两个小时。 15. A. bike B. suit C. boat D. kite 【 解析 】 选 D。 此处指带着他的折叠好的风筝 , 搭乘公交车回家。 16. A. wave B. train C. wind D. plane 【 解析 】 选 A。 根据上下文可知他是利用风筝冲浪去上班 , 所以此处要用 ride the wave。 17. A. beats B. blows C. hits D. strikes 【 解析 】 选 A。 beat在此处表示 “ 打败 , 击败 ”。 18. A. however B. but C. therefore D. thus 【 解析 】 选 B。 根据语境可知此处表示转折。 若选 A, 要在空后面加逗号。 19. A. caring B. looking C. applying D. providing 【 解析 】 选 C。 care for喜欢。 look for寻找。 apply for申请。 provide for 提供。 此处 apply for permission=ask for permission表示 “ 请求允许 ”。 20. A. doing B. letting C. producing D. making 【 解析 】 选 D。 make use of利用。 Ⅴ . 短文改错 假定英语课上老师要求同桌之间交换修改作文 , 请你修改你同桌写的以下作文。 文中共有 10处语言错误 , 每句中最多有两处。 每处错误仅涉及一个单词的增加 、 删除或修改。 增加:在缺词处加一个漏字符号 (∧ ), 并在其下面写出该加的词。 删除:把多余的词用斜线 (\)划掉。 修改:在错的词下划一横线 , 并在该词下面写出修改后的词。 注意: 1. 每处错误及其修改均仅限一词。 2. 只允许修改 10处 , 多者 (从第 11处起 )不计分。 1. 【 解析 】 第一句中第一个 in后面加 a。 此处表示泛指 “ 一个 ”。 2. 【 解析 】 第二句中把 enjoyed改为 enjoying。 I为 enjoy动作的执行者 , 故此处使用现在分词 enjoying, 其前面省去了 I was。 3. 【 解析 】 第二句中把 strangely改为 strange。 形容词strange作后置定语修饰不定代词 something。 4. 【 解析 】 第四句中把 are改为 were。 此处叙述过去正在发生的事情 , 故使用过去进行时。 5. 【 解析 】 第六句中把 ago改为 before。 ago与一般过去时连用 , 副词 before一般与完成时连用。 6. 【 解析 】 第六句中把 low改为 high。 in high spirits表示 “ 热情高涨 ”。 7. 【 解析 】 第七句中 had后加 been。 此处为 there be结构。 8. 【 解析 】 第八句中去掉 both或 two。 both与后面的 two重复 , 只可以使用其中之一。 9. 【 解析 】 第九句中把 left改为 leaving。 现在分词作状语表示结果。 10. 【 解析 】 第十句中把 joke改为 fun。 make fun of表示 “ 取笑 ”。 Ⅵ . 书面表达 [ 2020琼海模拟] 假如你叫李华 , 暑假你去英国旅游 , 可是回国后发现你的相机落在旅馆了 , 所以你需要给旅馆负责人写一封信。 内容包括: 1. 入住时间: 7月 7日 ~7月 11日。 房间号: 603。 2. 相机:型号 Canon Ixus860, 白色。 你的 16岁生日礼物 , 很重要。 3. 请他 /她帮你寻找并寄回 , 并表示感谢。 4. 你的地址在信封上。 注意: 1. 词数 100左右。 2. 可以适当增加细节 , 以使行文连贯。 3. 开头和结尾已给出 , 不计入总词数。 参考词汇: check in (为住旅馆或登机等 )办理登记手续 Dear Sir or Madam, _______________________________________________________________________________________________。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。