外文文献翻译--浅谈锚杆技术在边坡工程中的应用内容摘要:
mm, SA = 3210m . ( 4) The calculation of anchorage body and rock mass anchoring length anchoring length should not only meet the requirements which the bond force of formation on mortar and the bond stress of mortar on steel, but also meet the requirements that the Structure design codes the Minimum anchoring length. (4) In the formula: al is the anchoring length。 D is the diameter of anchorage body。 rbf is the bond strength eigenvalue of layer and anchorage body, through the experiment or local experience sure, or according to the standard to selection ( this engineering’s rock mass uniaxial pressive 2 2 2 21 1 12 0 9 ta n ( 4 5 ) 2 0 9 0 . 2 1 7 1 7 5 . 7 7 /2 2 2 2eaaE H K k N m costkak HN 2aSyNA f1akarbNl Dfstrength is aMP , belong to soft rock, rock mass structural plane development, rbf take 300 aKP )。 1 is the bond working conditions coefficient of anchorage body and layer (permanent anchor take ). According to the calculation, al , take al =. ( 5) The anchoring length between anchor steel and anchor mortar al (5) In the formula: al is the anchoring length between steel and mortar。 d is the diameter of anchor bar。 n is the number of steel。 bf is the bond strength design value between steel and anchor mortar, through the experiment sure, or according to the standard take。 3 is the working conditions coefficient of steel and mortar bond strength(permanent anchor take ) . According to the calculation, al , take al =. The construction technology and key points of anchor The anchor’s construction technology is as follows: buildup scaffold—— excavate and clear up the slope surface—— measures to fix position—— drill hole—— washing hole—— bolt put in a certain place—— grout—— colligation the end of the anchor—— flushing the slope surface——pouring frame space—— Spray seed ( 1) This slope belong to rocky slope, after excavate the slope 10 cm to the underside of the frame space, set bolt and pouring frame space, then spray grass or seeds after borrowed soil 20 cm in the frame space. ( 2) the slope should be payed attention to clean up, when construction. The anchor should be placed after wash hole, then put pressure () and grout. After the mortar fully solidification, colligation steel, castinplace。外文文献翻译--浅谈锚杆技术在边坡工程中的应用
相关推荐
导轨架加节升高 附墙连接 用的标准节插口清除杂物,涂抹少量黄油。 把标准节 (一般不多于六节 )用 M24*240 螺栓连接起来。 把接好的标准节吊到导轨架上 ,使齿条在同一方向,插好定位销,用 M24*240螺栓连接。 附墙连接如附图所示 附墙部位:从地下室顶板标高 至 标高设第一道附墙连接杆,以上每三层设一道附墙连接杆,详见附图 310A。 附墙连接部位详见如下说明: ① 1栋:
氧化碳、氨、油蒸气、氮氧化物、苯、二氧化硫、二硫化碳等有毒物质,易发生泄漏挥发,引发中毒事故。 、盐酸、氢氧化钠等,易发生酸碱灼伤事故。 ,应避免过 分接近,当心电离辐射。 、空冷、加热炉、高压气体放空等产生的噪声,会对人体造成潜在伤害。 炼油厂主要危害物质的安全卫生特性 (含硫瓦斯、酸性气):无色有臭鸡蛋气味的气体,易燃,与空气混合能形成爆炸性混合物,遇明火、高热能引起燃烧爆炸。
o +15) V logic level inputs patible with TTL. Be seen from Figure 31, the DAC0832 in two latches the first latch is called the input register, it allows the latched signal as ILE, the second latch
table for relatively tough in conditions Under the poor conditions of the job. The use of LCD Using micro LCD display device, 1602LCD, its performance point is: working voltage only ~ V。 Very low
1 99 1089 吊灯 飞利普 50 87 4350 吸顶灯 佛山 22 15 330 水下灯 / 9 39 351 侧光灯 / / 14 / LED灯 飞利普 18 90 1620 循环水泵 / / 5 / 雨水泵 65WQ40- 123 1500 13 19500 污水泵 RW2110BE 3000 6 18000 空调循环水泵 SLW65200(I)A 7500 3 22500