高中英语外研版必修4课件:module6内容摘要:
n Pembrokeshire, Wales—yet exactly how they were transported to the site in such a primitive④ age is a believe they may have been transported for most of the way by water, before being dragged overland for the last stage of the journey. It has been suggested that Stonehenge once operated as a massive astronomical⑤ clock, and there are even suggestions that it was a landing site for UFOs (Unidentified Flying。高中英语外研版必修4课件:module6
相关推荐
ntity n. [C, U]身份;特性 His driving license revealed his identity. 他的驾驶执照证明了他的身份。 He has no sense of his own identity. 他缺乏自我意识。 知识拓展 identify v. 使 „„ 等同于;鉴别出; Wealth cannot be identified with happiness.
功就是提高自己的修养 , 外功就是要求广施善行。 具体来说就是义和忠。 •舍身就义,英雄情怀;忠心耿耿,高尚情操;再加上超强武功的防守,成就了武 侠精神在民间广泛推崇。 ( 3)武侠精神 • 简单说是武术伦理的外在表现 • 武术伦理,大到保家卫国,小到锄强扶弱、济困扶危 • 具体说是通过侠士独立人格、个体尊严,实现保家卫国,小到锄强扶弱、济困扶危 ( 4)武侠精神的实现途径 • 通过
追忆 … 这不能不在广大观众中间产生共鸣。 《 魂断蓝桥 》 一直为广大观众喜爱并在评论界备受赞扬,原因就在于影片从始至终紧扣爱情主题,罗依和玛拉相爱,爱得炽烈奔放,爱得无我忘我。 玛拉可以不顾自己的舞蹈事业,为了见罗依而误场;罗依对玛拉一见钟情,在没有同家人商量的情况下,马上决定同她结婚。 然而事与愿违,战争把他们分开,战争使得玛拉改变命运,当女人公玛拉在得知心爱的恋人罗依 “ 战死 ” 的消
尤指比赛中的得分。 We won by 5 points. 我们赢了 5分。 (2)mark指考试中的得分,常用复数形式,也可以说 a good mark(一个好分数 )。 ① The teacher gave me only 60 marks for my story. 老师仅给了我的故事 60分。 ② The score in the football game was 4 to 1.
分类及举例 生产 火灾危险性特征 火灾危险性分类举例 类别 生产时使用或产生的物质特 < 28℃ 的油品和有机溶剂的提炼、回收或洗 征: 涤部位及其泵房,橡胶制品的涂胶和胶浆部位, < 28℃ 的液体 二硫化碳的粗馏、精馏工段及其应用部位,青霉 < 10%的气体 素提炼部位,原料药厂的非纳西汀车间的烃化、 甲 回收及电感精馏部位,皂素车间的抽提、结晶及 气中氧化即能导致迅速自 过滤部位
到如下几个目标: ① 功能齐全 ,注重实用 ② 界面友好, 操作简单 ③ 安全性高 ,交互性强 ④ 便于维护, 可靠性强 ⑤ 部署 简单,运行容易 实现可行性 可行性研究是为了弄清楚系统开发的项目是不是可以实现和值得进行研究的过程,实际上是一次大大简化系统分析和系统设计的过程,所以,进行可执行性的分析是非常必要的,经过最初的设计目标和进行的市场调查得出以下四点的可行性分析: ( 1) 经济可行性