高中英语人教版课件必修3unit3period1reading内容摘要:

enry’s eyes stare at what is left of the brother’s dinner on the table? A. Because he was interested in the dinner. B. Because he was very hungry. C. Because he was very angry. D. Because he had never seen so nice a dinner. 3) We can infer that the person the two brothers chose might be_______. A. handsome B. talkative C. hardworking and poor D. proud and rich Reading II Listening Reading About a month ago Henry was ________ out of the bay. Towards nightfall Henry found himself _________out to sea by a strong wind. The next morning Henry was _________ by a ship. Lastly Henry arrived in _________ by working on the ship as an unpaid hand. Now Henry was _____ in London and wandering In the street. Just at that time Roderick _________ him and asked him to Step in. To Henry’s surprise Roderick gave Henry a _______ with money in it. sailing carried spotted London lost called letter ReadingⅢ Read Act one again, then fill in the following form. What kin。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。