高中英语unit4section2learningaboutlanguage课件新人教版必修2内容摘要:

ok after, talk about,think of等动词与介词构成的短语用于现在进行时的被动语态时,其中的介词不可省略。 • Something is being talked about among those people. • 在那些人中正谈论着某件事情。 • 3.某些表示 “ 状态、心理活动、存在 ” 等的动词,如 have, want, need, love,一般不用现在进行时的被动语态,而常用一般现在时的被动语态。 • ① Mr Li, you are wanted on the phone. • 李先生,有你的电话。 • ② Computer games are loved by more and more young people. • 计算机游戏被越来越多的年轻人喜爱。 • 4. “ be+ under/in...+ n.” 可表示现在进行时的被动意义。 • The problem is under discussion at the meeting. • = The problem is being discussed at the meeting. • 这个问题正在会议上讨论。 • My puter is under repair. • = My puter is being repaired. • 我的电脑正在维修中。 课堂达标验收 • Ⅰ .单句语法填空 • 1. —Why don39。 t we choose that road to save time? • —The bridge to it________(repair). • 答案: is being repaired/is under repair 考查时态。 句意: ——你为什么不选择那条路以节省时间呢。 ——通向那条路的桥正在被修。 现在进行时的被动语态符合题目的语境,它的构成是 “ am/is/are+ being done” ,相当于 be under+ n.。 • 2. Would you please keep silent? The weather report ______ (broadcast) and I want to listen. • 答案: is being broadcast 本题考查现在进行时的用法。 句意:能否请你保持安静。 现在正播放天气预报 ——这正是我要听的节目。 • 3. —Hi, Terry, can I use your puter for a while this afternoon? • —Sorry. It________(repair). • 答案: is being repaired 考查时态和语态。 由上下句可知 “ 电脑应正在被维修 ” ,故应用现在进行时的被动语态,相当于。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。