新人教版英语高二上module6unit3ahealthylife之二内容摘要:

fast as you can and try to find out: A grandfather wrote the letter to his grandson James. Two parts. The first part is a letter and the second part is an inter page. 1. How many parts does the reading text consist of? 2. Who wrote the letter to whom? The First part : A Letter Read the whole text and find out the main idea of each paragraph. A. The writer leads to the topic of the letter by talking about James’ problem of smoking. B. Introducing three different ways of being addicted. C. Telling the writer’s hope for his grandson and advice on stopping smoking. D. Telling the harmful effects o。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。