北师大版英语高一上册module1unit3celebration(lesson1)内容摘要:
repair, paint, plant, water, visit is being repaired. are being planted. are being watered. is being painted. is being repaired. is being visited. 2. am/is/are being done amp。 have/has been done ① (the office/clean) ② (the shirts/iron) ③ (the window/break) ④ (the roof/repair) ⑤ (the car/damage) ⑥ (the houses/knock down) ⑦ (the trees/cut down) ⑧ (they/invite/to a party) The office is being cleaned. The shirts have been ironed. The window has been broken. The roof is being repaired. The car has been damaged. The houses are being knocked down. The trees hav。北师大版英语高一上册module1unit3celebration(lesson1)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。